Port-to-port route

Shipping from Shanghai to Savannah

Port of Shanghai, China → Port of Savannah, United States

Ocean freight from the Port of Shanghai to the Port of Savannah is one of the busiest port-to-port routes tracked on bexy, with 15,006 shipments on record loaded at Shanghai and discharged at Savannah. Planned port-to-port transit from Shanghai to Savannah has a median of 32 days (middle half 30–38 days, 90% within 46 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Savannah in the carrier's routing, across 195 shipments.

Shipments tracked
15,006
Median planned port-to-port
32 days
Median actual transit
39 days
Planned via a hub
0%

Planned port-to-port transit · Shanghai → Savannah

32days median

Middle half
30–38 days
90% within
46 days
Shipments
195

From the loaded-on-board date at Shanghai to the first planned arrival at Savannah in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

39days median

Middle half 35–40 days · 90% within 45 days · n = 278 shipments with a recorded discharge

Loaded on board at Shanghai → container discharged at Savannah, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Shanghai to Savannah ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Savannah — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 39 days (middle half 35–40 days, 90% within 45 days) across 278 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 195 Shanghai-to-Savannah shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to United States trade lane.

Track an Evergreen (EGLV) shipment from Shanghai to Savannah by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 195 shipments with a planned routing to Savannah are planned direct from Shanghai. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Shanghai → Savannah

Frequently asked questions

How long does it take to ship from Shanghai to Savannah?
Planned port-to-port transit from Shanghai to Savannah has a median of 32 days (middle half 30–38 days, 90% within 46 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Savannah in the carrier's routing, across 195 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Savannah adds time.
How long does shipping from Shanghai to Savannah actually take?
Actual transit from Shanghai to Savannah, from the carrier's container discharge events, has a median of 39 days (middle half 35–40 days, 90% within 45 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Savannah, across 278 shipments with a recorded discharge at Savannah. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Savannah is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Shanghai to Savannah shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 195 Shanghai-to-Savannah shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Shanghai to Savannah route?
By place of receipt and delivery, cargo loaded at Shanghai and discharged at Savannah travels mostly on the China to United States trade lane on bexy.
How many shipments are tracked from Shanghai to Savannah?
bexy has 15,006 shipments on record loaded at Shanghai and discharged at Savannah, the most recent departing Oct 15, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Shanghai to Savannah?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Shanghai to Savannah

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 15,006 tracked Bills of Lading loaded at Shanghai and discharged at Savannah · planned port-to-port transit over 195 shipments · actual transit to discharge over 278 shipments with a recorded discharge · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Shanghai to Savannah Shipping Time — Port to Port", data as of 2026-10-19, n = 15,006 tracked shipments. https://bexy.io/routes/shanghai-to-savannah

Definitions, thresholds and limitations are on the methodology page.