Evergreen
EGSU1708069 · Qingdao → Manila South Port
EGLV•••••••••••••
- Scheduled transit
- 35 days
- On board → ETA at Manila South Port
Source: bexy, https://bexy.io/track/6a81bfe8ef0da6ac730b9033
Shipment summary
This Evergreen shipment from Qingdao, China to Manila South Port, Philippines was loaded on board on Aug 4, 2026 at the Port of Rizhao aboard HAISHUNFENG15 1005 (海顺丰15) and was due to arrive at the Port of Manila South Port on Sep 8, 2026, per carrier data as of Aug 26, 2026. That is about 35 days from loading to arrival.
The shipment moves 1 container, EGSU1708069 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 10,288.730 KGS. The most recent container event is "Discharged from UNI-PROBITY 0918-404B and waiting for transshipping at KAOHSIUNG (TW)" on Aug 15, 2026.
Cargo loads at the Port of Rizhao and is discharged at the Port of Manila South Port before final delivery to Manila South Port, Philippines.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]ReceiptQINGDAOAug 4, 2026
- [CN]Port of loadingRIZHAOAug 4, 2026HAISHUNFENG15 1005 (海顺丰15)
- [PH]DeliveryMANILA SOUTH PORTSep 8, 2026
Voyage timeline
- QINGDAO[CN]Aug 4, 2026Receipt
- RIZHAO[CN]Aug 4, 2026
HAISHUNFENG15 1005 (海顺丰15)
Port of loading - MANILA SOUTH PORT[PH]Sep 8, 2026Expected position (by schedule)
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 10,288.730 KGS
- Manifest qty
- 793 CARTONS
- Measurement
- 64.0550 CBM
- Vessel / voyage
- HAISHUNFENG15 1005 (海顺丰15)
- BL no.
- EGLV•••••••••••••
- On-board date
- Aug 4, 2026
Containers 1
Discharged from UNI-PROBITY 0918-404B and waiting for transshipping at KAOHSIUNG (TW)
Aug 15, 2026