Back to search

In transit · 78% EVER PRIDE 0159-430W (長尊輪)

Evergreen

EGSU3395657 + 6 more · Aliaga → Taichung

Bill of Lading 5946••••••••

EGLV•••••••••••••

PORT/PORT
7×
Planned transshipment: Port Klang West Port
ETDSep 18, 2026
ETAOct 29, 2026

data as of

ALIAGA[TR]TAICHUNG[TW]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
41 days
On board → ETA at Taichung
To go
10 days
Until the ETA at Taichung, by schedule

Shipment summary

This Evergreen shipment from Aliaga, Turkey to Taichung, Taiwan was loaded on board on Sep 18, 2026 at the Port of Aliaga aboard EVER PRIDE 0159-430W (長尊輪) and is expected at the Port of Kaohsiung on Oct 26, 2026. Onward delivery to Taichung is scheduled for Oct 29, 2026. That is about 41 days from loading to arrival at Taichung.

The shipment moves 7 containers, EGSU3395657, EGHU3375071, EGSU3389090, EGHU3336922, EGHU3968441 and EGSU3290759 and 1 more (7 × 20'(SD)), booked PORT/PORT, with a declared gross weight of 161,080.000 KGS. The most recent container event is "Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)" on Sep 23, 2026.

Cargo loads at the Port of Aliaga, calls at Port Klang West Port and is discharged at the Port of Kaohsiung before final delivery to Taichung, Taiwan.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [TR]Port of loadingALIAGASep 18, 2026EVER PRIDE 0159-430W (長尊輪)
  2. [MY]TransshipmentPORT KLANG WEST PORTOct 18, 2026CSCL URANUS 109E
  3. [TW]Port of dischargeKAOHSIUNGOct 26, 2026EVER BURLY N094
  4. [TW]DeliveryTAICHUNGOct 29, 2026

Voyage timeline

  1. ALIAGA[TR]Sep 18, 2026

    EVER PRIDE 0159-430W (長尊輪)

    Port of loading
  2. PORT KLANG WEST PORT[MY]Oct 18, 2026

    CSCL URANUS 109E

    Expected position (by schedule)
  3. KAOHSIUNG[TW]Oct 26, 2026

    EVER BURLY N094

    Port of discharge
  4. TAICHUNG[TW]Oct 29, 2026
    Delivery

Shipment facts

Containers
7
Gross weight
161,080.000 KGS
Manifest qty
9 BLOCKS
Measurement
175.0000 CBM
Vessel / voyage
EVER PRIDE 0159-430W (長尊輪)
BL no.
EGLV•••••••••••••
On-board date
Sep 18, 2026

Containers
7

7 × 20'(SD)

GlossarySize/typeFCLVGMStatusWhat these statuses mean

EGSU3395657
20'(SD)
FCL/FCL 1 BLOCKSVGM 24020 KGSS/N EMCKVP5034

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 21, 2026

EGHU3375071
20'(SD)
FCL/FCL 2 BLOCKSVGM 25980 KGSS/N EMCKVP6104

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 22, 2026

EGSU3389090
20'(SD)
FCL/FCL 1 BLOCKSVGM 23720 KGSS/N EMCKVP5094

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 22, 2026

EGHU3336922
20'(SD)
FCL/FCL 2 BLOCKSVGM 29780 KGSS/N EMCKVP6124

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 22, 2026

EGHU3968441
20'(SD)
FCL/FCL 1 BLOCKSVGM 21260 KGSS/N EMCKVP5224

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 23, 2026

EGSU3290759
20'(SD)
FCL/FCL 1 BLOCKSVGM 23960 KGSS/N EMCKVP6114

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 22, 2026

EGSU3309746
20'(SD)
FCL/FCL 1 BLOCKSVGM 27260 KGSS/N EMCKVP6174

Discharged from EVER PRIDE 0159-430W and waiting for transshipping at PIRAEUS (GR)

Sep 22, 2026

Track another shipment

BL▸