Back to search

In transit · 92% EVER ECO 0830-004W (長生輪)

Evergreen

EITU0105999 + 1 more · Shanghai → Helsingborg

Bill of Lading 1426••••••••

EGLV•••••••••••••

PORT/PORT
2×
Planned transshipment: Hamburg
ETDSep 30, 2026
ETANov 27, 2026

data as of

SHANGHAI[CN]HELSINGBORG[SE]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
58 days
On board → ETA at Helsingborg
To go
5 days
Until the ETA at Helsingborg, by schedule

Shipment summary

This Evergreen shipment from Shanghai, China to Helsingborg, Sweden was loaded on board on Sep 30, 2026 at the Port of Shanghai aboard EVER ECO 0830-004W (長生輪) and is expected at the Port of Helsingborg on Nov 27, 2026. That is about 58 days from loading to arrival.

The shipment moves 2 containers, EITU0105999 and EITU8130107 (1 × 20'(SD), 1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 19,250.000 KGS. The most recent container event is "Loaded (FCL) on EVER ECO 0830-004W at SHANGHAI (CN)" on Sep 30, 2026.

Cargo loads at the Port of Shanghai, calls at Hamburg and is discharged at the Port of Helsingborg before final delivery to Helsingborg, Sweden.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [CN]Port of loadingSHANGHAISep 30, 2026EVER ECO 0830-004W (長生輪)
  2. [DE]TransshipmentHAMBURGNov 20, 2026EVER ECO 0830-004W
  3. [SE]DeliveryHELSINGBORGNov 27, 2026

Voyage timeline

  1. SHANGHAI[CN]Sep 30, 2026

    EVER ECO 0830-004W (長生輪)

    Port of loading
  2. HAMBURG[DE]Nov 20, 2026

    EVER ECO 0830-004W

    Expected position (by schedule)
  3. HELSINGBORG[SE]Nov 27, 2026
    Delivery

Shipment facts

Containers
2
Gross weight
19,250.000 KGS
Manifest qty
4 PACKAGES
Measurement
55.0000 CBM
Vessel / voyage
EVER ECO 0830-004W (長生輪)
BL no.
EGLV•••••••••••••
On-board date
Sep 30, 2026

Containers
2

1 × 20'(SD) · 1 × 40'(SH)

GlossarySize/typeFCLVGMStatusWhat these statuses mean

EITU0105999
20'(SD)
FCL/FCL 2 PACKAGESVGM 6775 KGSS/N EMCVQA7094

Loaded (FCL) on EVER ECO 0830-004W at SHANGHAI (CN)

Sep 30, 2026

EITU8130107
40'(SH)
FCL/FCL 2 PACKAGESVGM 18490 KGSS/N EMCVPP2664

Loaded (FCL) on EVER ECO 0830-004W at SHANGHAI (CN)

Sep 30, 2026

Track another shipment

BL▸