Back to search

In transit · 39% EVER ACT 1424-019W (長儀輪)

Evergreen

TGBU9935793 + 2 more · Shanghai → Leixoes

Bill of Lading 1426••••••••

EGLV•••••••••••••

PORT/PORT
3×
Planned transshipment: Rotterdam
ETDOct 29, 2026
ETAJan 10, 2027

data as of

SHANGHAI[CN]LEIXOES[PT]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
73 days
On board → ETA at Leixoes
To go
45 days
Until the ETA at Leixoes, by schedule

Shipment summary

This Evergreen shipment from Shanghai, China to Leixoes, Portugal was loaded on board on Oct 29, 2026 at the Port of Shanghai aboard EVER ACT 1424-019W (長儀輪) and is expected at the Port of Leixoes on Jan 10, 2027. That is about 73 days from loading to arrival.

The shipment moves 3 containers, TGBU9935793, DRYU9692052 and EGSU1144971 (3 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 40,901.000 KGS. The most recent container event is "Loaded (FCL) on EVER ACT 1424-019W at SHANGHAI (CN)" on Oct 28, 2026.

Cargo loads at the Port of Shanghai, calls at Rotterdam and is discharged at the Port of Leixoes before final delivery to Leixoes, Portugal.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [CN]Port of loadingSHANGHAIOct 29, 2026EVER ACT 1424-019W (長儀輪)
  2. [NL]TransshipmentROTTERDAMDec 28, 2026EVER ACT 1424-019W
  3. [PT]DeliveryLEIXOESJan 10, 2027

Voyage timeline

  1. SHANGHAI[CN]Oct 29, 2026

    EVER ACT 1424-019W (長儀輪)

    Departed
  2. ROTTERDAM[NL]Dec 28, 2026

    EVER ACT 1424-019W

    Transshipment
  3. LEIXOES[PT]Jan 10, 2027
    Delivery

Shipment facts

Containers
3
Gross weight
40,901.000 KGS
Manifest qty
65 PALLETS
Measurement
168.0000 CBM
Vessel / voyage
EVER ACT 1424-019W (長儀輪)
BL no.
EGLV•••••••••••••
On-board date
Oct 29, 2026

Containers
3

3 × 40'(SH)

GlossarySize/typeFCLVGMStatusWhat these statuses mean

TGBU9935793
40'(SH)
FCL/FCL 22 PALLETSVGM 17068.8 KGSS/N EMCFWM5205

Loaded (FCL) on EVER ACT 1424-019W at SHANGHAI (CN)

Oct 28, 2026

DRYU9692052
40'(SH)
FCL/FCL 21 PALLETSVGM 18560.8 KGSS/N EMCFWM6765

Loaded (FCL) on EVER ACT 1424-019W at SHANGHAI (CN)

Oct 28, 2026

EGSU1144971
40'(SH)
FCL/FCL 22 PALLETSVGM 16541.4 KGSS/N EMCFUF8175

Loaded (FCL) on EVER ACT 1424-019W at SHANGHAI (CN)

Oct 28, 2026

Track another shipment

BL▸