Port · Pakistan

Port of Karachi

The Port of Karachi in Pakistan is an actively tracked Evergreen discharge port on bexy, with 6,053 tracked arrivals, most often from China, Saudi Arabia and Turkey.

Arrivals
6,053
Departures
0
Median planned port-to-port
21 days
Top origins
6

Location

UN/LOCODE
PKKHI
Time zone
Asia/Karachi

Code from the UNECE UN/LOCODE list (release 2024-2), matched by bexy to the city and country in Evergreen's record. A port spans many berths: a position stands for the port or its city, not a terminal.

About the Port of Karachi

Cargo bound for Karachi is most often loaded at Shanghai, Qingdao, Dammam and Xingang. Planned port-to-port transit to Karachi has a median of 21 days (middle half 18–27 days, 90% within 39 days), an estimate measured from the loaded-on-board date to the first planned arrival at Karachi in the carrier's routing, across 195 shipments. It weights each loading port by its number of arrivals, over the loading ports with at least 20 measured shipments, which carry 81% of the arrivals. Actual transit to Karachi, from the carrier's container discharge events, has a median of 29 days (middle half 23–32 days, 90% within 40 days), measured from the loaded-on-board date to the day a container was discharged at Karachi, across 213 shipments with a recorded discharge at Karachi. It weights each loading port by its number of arrivals, over the loading ports with at least 20 recorded discharges, which carry 80% of the arrivals.

Track an Evergreen (EGLV) shipment through Karachi by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Arrivals at Karachi

Where cargo for Karachi comes from
Origin country Shipments
China [CN]5,268
Saudi Arabia [SA]635
Turkey [TR]64
Netherlands [NL]29
Germany[DE]18
Spain[ES]10
Loading ports feeding Karachi
Port of loading Shipments Route
Port of Shanghai [CN]4,251Shanghai → Karachi
Port of Qingdao [CN]617Qingdao → Karachi
Port of Dammam [SA]471—
Port of Xingang [CN]252—
Port of Jeddah [SA]164—
Port of Ningbo [CN]86—
Planned port-to-port transit to Karachi estimated (from the carrier's planned routing)
Median 21 days
Middle half (P25–P75) 18–27 days
90% within (P90) 39 days
Shipments measured 195

From the loaded-on-board date to the planned arrival at Karachi in the carrier's routing — estimates, port to port, with no inland leg. Volume-weighted across the loading ports with at least 20 measured shipments, which carry 81% of the arrivals.

Actual port-to-port transit to Karachi actual (from carrier discharge events)
Median 29 days
Middle half (P25–P75) 23–32 days
90% within (P90) 40 days
Shipments with a recorded discharge 213

From the loaded-on-board date to the day a container was discharged at Karachi, as Evergreen's container events record it — actual dates, not estimates, for only the shipments whose discharge is on record. Volume-weighted across the loading ports with at least 20 recorded discharges, which carry 80% of the arrivals.

Recent shipments bound for Karachi

Frequently asked questions

Where is the Port of Karachi?
The Port of Karachi is a container shipping port in Pakistan. bexy tracks 6,053 shipment legs moving through it.
Where does cargo arriving at the Port of Karachi come from?
Cargo discharged at Karachi most often comes from China, Saudi Arabia, Turkey and Netherlands, loaded mainly at Shanghai, Qingdao, Dammam and Xingang. Origins are the place-of-receipt countries on the Evergreen (EGLV) Bills of Lading tracked on bexy.
How long does shipping to Karachi take?
Planned port-to-port transit to Karachi has a median of 21 days (middle half 18–27 days, 90% within 39 days), an estimate measured from the loaded-on-board date to the first planned arrival at Karachi in the carrier's routing, across 195 shipments. It weights each loading port by its number of arrivals, over the loading ports with at least 20 measured shipments, which carry 81% of the arrivals. These are the carrier's planned dates, port to port; any inland leg after discharge at Karachi adds time.
How long does shipping to Karachi actually take?
Actual transit to Karachi, from the carrier's container discharge events, has a median of 29 days (middle half 23–32 days, 90% within 40 days), measured from the loaded-on-board date to the day a container was discharged at Karachi, across 213 shipments with a recorded discharge at Karachi. It weights each loading port by its number of arrivals, over the loading ports with at least 20 recorded discharges, which carry 80% of the arrivals. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Karachi is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
How busy is the Port of Karachi?
bexy tracks 0 export and 6,053 import shipment legs at Karachi. These are the Evergreen (EGLV) shipments on record, not the port's total throughput.
How do I track a shipment to the Port of Karachi?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to follow the vessel, voyage and each container from departure to arrival — free, with no login.

6,053 shipments arriving

Port of Karachi · filterable by lane, date & weight

View shipments

More ports in Pakistan

Nearby ports

Up to 5 port pages on bexy with a known position within 500 km, nearest first, measured as the crow flies, not by sea.

Aggregated from 6,053 tracked shipment legs · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Port of Karachi — Shipments & Routes", data as of 2026-10-19, n = 6,053 tracked shipment legs. https://bexy.io/ports/karachi

Definitions, thresholds and limitations are on the methodology page.