Port · Netherlands

Port of Rotterdam

The Port of Rotterdam in Netherlands is a major Evergreen discharge port on bexy, with 52,069 tracked arrivals, most often from China, Turkey and Portugal, and 8,776 shipments loaded for export.

Arrivals
52,069
Departures
8,776
Median planned port-to-port
40 days
Top origins
6

Location

UN/LOCODE
NLRTM
Coordinates
51.88° N, 4.29° E
port position from Wikidata (opens in a new tab)
Time zone
Europe/Amsterdam

Code from the UNECE UN/LOCODE list (release 2024-2), matched by bexy to the city and country in Evergreen's record. A port spans many berths: a position stands for the port or its city, not a terminal.

About the Port of Rotterdam

Cargo bound for Rotterdam is most often loaded at Shanghai, Qingdao, Xingang and Ningbo. Planned port-to-port transit to Rotterdam has a median of 40 days (middle half 37–46 days, 90% within 51 days), an estimate measured from the loaded-on-board date to the first planned arrival at Rotterdam in the carrier's routing, across 2,322 shipments. It weights each loading port by its number of arrivals, over the loading ports with at least 20 measured shipments, which carry 96% of the arrivals. Actual transit to Rotterdam, from the carrier's container discharge events, has a median of 49 days (middle half 43–54 days, 90% within 59 days), measured from the loaded-on-board date to the day a container was discharged at Rotterdam, across 1,532 shipments with a recorded discharge at Rotterdam. It weights each loading port by its number of arrivals, over the loading ports with at least 20 recorded discharges, which carry 98% of the arrivals. On the 334 shipments with both a planned arrival and a recorded discharge at Rotterdam, across 34 sailings, containers were discharged a median 3 days after the carrier's planned arrival: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

Containers loaded at Rotterdam most often sail to China, United States, Taiwan and Japan. Estimated outbound transit averages about 45 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, across 675 shipments with a usable on-board date and estimated arrival. It weights each destination country by its number of departures, over the destination countries with at least 20 measured shipments, which carry 87% of the departures.

Track an Evergreen (EGLV) shipment through Rotterdam by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Arrivals at Rotterdam

Where cargo for Rotterdam comes from
Origin country Shipments
China [CN]51,955
Turkey [TR]51
Portugal[PT]21
Ireland[IE]15
Lithuania[LT]10
Cyprus[CY]7
Planned port-to-port transit to Rotterdam estimated (from the carrier's planned routing)
Median 40 days
Middle half (P25–P75) 37–46 days
90% within (P90) 51 days
Shipments measured 2,322

From the loaded-on-board date to the planned arrival at Rotterdam in the carrier's routing — estimates, port to port, with no inland leg. Volume-weighted across the loading ports with at least 20 measured shipments, which carry 96% of the arrivals.

Actual port-to-port transit to Rotterdam actual (from carrier discharge events)
Median 49 days
Middle half (P25–P75) 43–54 days
90% within (P90) 59 days
Shipments with a recorded discharge 1,532

From the loaded-on-board date to the day a container was discharged at Rotterdam, as Evergreen's container events record it — actual dates, not estimates, for only the shipments whose discharge is on record. Volume-weighted across the loading ports with at least 20 recorded discharges, which carry 98% of the arrivals.

Schedule slip vs plan at Rotterdam same shipments: actual discharge minus planned arrival
Median +3 daysafter the planned arrival
Middle half (P25–P75) +2 to +5 days
Shipments with both dates 334
Sailings (vessel voyages) 34

Per shipment, the day a container was discharged at Rotterdam minus the first planned arrival there, over only the shipments with both — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is not weighted by loading port. Every container on a late vessel is late together, so the slip is shown only when those shipments came on at least 5 sailings.

On the 334 shipments with both a planned arrival and a recorded discharge at Rotterdam, across 34 sailings, containers were discharged a median 3 days after the carrier's planned arrival: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

Departures from Rotterdam

Top destinations from Rotterdam
Destination country Shipments
China [CN]2,226
United States [US]1,643
Taiwan [TW]839
Japan [JP]679
India [IN]444
Vietnam [VN]411
Estimated transit from Rotterdam
Median 44 days
Middle half (P25–P75) 34–52 days
90% within (P90) 66 days
Shipments measured 675

From the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when Evergreen gives no ETA — estimates, which can include an inland leg. Volume-weighted across the destination countries with at least 20 measured shipments, which carry 87% of the departures.

Recent shipments bound for Rotterdam

Frequently asked questions

Where is the Port of Rotterdam?
The Port of Rotterdam is a container shipping port in Netherlands. bexy tracks 60,845 shipment legs moving through it.
Where does cargo arriving at the Port of Rotterdam come from?
Cargo discharged at Rotterdam most often comes from China, Turkey, Portugal and Ireland, loaded mainly at Shanghai, Qingdao, Xingang and Ningbo. Origins are the place-of-receipt countries on the Evergreen (EGLV) Bills of Lading tracked on bexy.
How long does shipping to Rotterdam take?
Planned port-to-port transit to Rotterdam has a median of 40 days (middle half 37–46 days, 90% within 51 days), an estimate measured from the loaded-on-board date to the first planned arrival at Rotterdam in the carrier's routing, across 2,322 shipments. It weights each loading port by its number of arrivals, over the loading ports with at least 20 measured shipments, which carry 96% of the arrivals. These are the carrier's planned dates, port to port; any inland leg after discharge at Rotterdam adds time.
How long does shipping to Rotterdam actually take?
Actual transit to Rotterdam, from the carrier's container discharge events, has a median of 49 days (middle half 43–54 days, 90% within 59 days), measured from the loaded-on-board date to the day a container was discharged at Rotterdam, across 1,532 shipments with a recorded discharge at Rotterdam. It weights each loading port by its number of arrivals, over the loading ports with at least 20 recorded discharges, which carry 98% of the arrivals. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Rotterdam is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. On the 334 shipments with both a planned arrival and a recorded discharge at Rotterdam, across 34 sailings, containers were discharged a median 3 days after the carrier's planned arrival: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
Where do shipments from the Port of Rotterdam go?
The most-tracked destinations for cargo loaded at Rotterdam are China, United States, Taiwan and Japan.
How busy is the Port of Rotterdam?
bexy tracks 8,776 export and 52,069 import shipment legs at Rotterdam, with estimated outbound transit averaging about 45 days. These are the Evergreen (EGLV) shipments on record, not the port's total throughput.
How do I track a shipment to the Port of Rotterdam?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to follow the vessel, voyage and each container from departure to arrival — free, with no login.

52,069 shipments arriving

Port of Rotterdam · filterable by lane, date & weight

View shipments

Nearby ports

Up to 5 port pages on bexy with a known position within 500 km, nearest first, measured as the crow flies, not by sea.

Aggregated from 60,845 tracked shipment legs · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Port of Rotterdam — Shipments & Routes", data as of 2026-10-19, n = 60,845 tracked shipment legs. https://bexy.io/ports/rotterdam

Definitions, thresholds and limitations are on the methodology page.