Trade lane

Shipping from Netherlands to India

Ocean freight from Netherlands to India is a tracked container trade lane on bexy, with 420 shipments on record. Median estimated transit is 43 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 34 and 52 days and 90% at 57 days or less, across 26 shipments with a usable on-board date and estimated arrival.

Shipments tracked
420
Median est. transit
43 days
Loading ports
1
Discharge ports
9

Estimated transit · Netherlands → India

43days median

Middle half
34–52 days
90% within
57 days
Shipments
26

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Netherlands to India ocean freight

Cargo on this lane loads mainly at Netherlands ports including Rotterdam and is discharged mainly at Nhava Sheva, Chennai, Kolkata and Mundra on the India side.

Every Netherlands-to-India shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.

Origin ports · Netherlands

Busiest destination ports · India

Top port pairs · Netherlands → India
Port of loading Port of discharge Shipments Share Planned port-to-port
RotterdamNhava Sheva20749%—
RotterdamChennai17241%—
RotterdamKolkata164%—
RotterdamMundra92%—
RotterdamCochin4<1%—
RotterdamVisakhapatnam4<1%—
RotterdamKattupalli3<1%—
RotterdamTuticorin3<1%—

Share is of this lane's shipments that record both ports.

Recent shipments · Netherlands → India

Frequently asked questions

How long does it take to ship from Netherlands to India?
The median estimated transit from Netherlands to India is 43 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 34 and 52 days and 90% at 57 days or less, across 26 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
Which ports handle Netherlands to India shipments?
Cargo most often loads at Rotterdam. On arrival it is most often discharged at Nhava Sheva, Chennai, Kolkata and Mundra.
How many shipments are tracked on the Netherlands to India route?
bexy has 420 shipments on record for the Netherlands to India lane, the most recent departing Jul 4, 2026.
How do I track a Netherlands to India shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 420 shipments

Netherlands → India · filterable by port, date & weight

View shipments

Aggregated from 420 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 26 shipments · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Netherlands to India Shipping — Transit Time", data as of 2026-10-19, n = 420 tracked shipments. https://bexy.io/shipping/netherlands-to-india

Definitions, thresholds and limitations are on the methodology page.