Port-to-port route

Shipping from Qingdao to Baltimore

Port of Qingdao, China → Port of Baltimore, United States

Ocean freight from the Port of Qingdao to the Port of Baltimore is a high-volume port-to-port route on bexy, with 2,562 shipments on record loaded at Qingdao and discharged at Baltimore. Planned port-to-port transit from Qingdao to Baltimore has a median of 54 days (middle half 48–59 days, 90% within 64 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Baltimore in the carrier's routing, across 135 shipments.

Shipments tracked
2,562
Median planned port-to-port
54 days
Median actual transit
53 days
Planned via a hub
30%

Planned port-to-port transit · Qingdao → Baltimore

54days median

Middle half
48–59 days
90% within
64 days
Shipments
135

From the loaded-on-board date at Qingdao to the first planned arrival at Baltimore in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

53days median

Middle half 52–55 days · 90% within 59 days · n = 245 shipments with a recorded discharge

Loaded on board at Qingdao → container discharged at Baltimore, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

0days median · on the planned day

Middle half −1 to 0 days · n = 20 shipments with both a planned arrival and a recorded discharge on this route, across 9 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

Qingdao to Baltimore ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Baltimore — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 53 days (middle half 52–55 days, 90% within 59 days) across 245 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, 30% of the 135 Qingdao-to-Baltimore shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Colon Container Terminal; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to United States trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Baltimore by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: 30% of 135 shipments with a planned routing to Baltimore are planned via a transshipment port, most often Colon Container Terminal (40); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Baltimore

Frequently asked questions

How long does it take to ship from Qingdao to Baltimore?
Planned port-to-port transit from Qingdao to Baltimore has a median of 54 days (middle half 48–59 days, 90% within 64 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Baltimore in the carrier's routing, across 135 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Baltimore adds time.
How long does shipping from Qingdao to Baltimore actually take?
Actual transit from Qingdao to Baltimore, from the carrier's container discharge events, has a median of 53 days (middle half 52–55 days, 90% within 59 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Baltimore, across 245 shipments with a recorded discharge at Baltimore. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Baltimore is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Qingdao to Baltimore shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 30% of the 135 Qingdao-to-Baltimore shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Colon Container Terminal; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Baltimore route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Baltimore travels mostly on the China to United States trade lane on bexy.
How many shipments are tracked from Qingdao to Baltimore?
bexy has 2,562 shipments on record loaded at Qingdao and discharged at Baltimore, the most recent departing Nov 14, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Baltimore?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Baltimore

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 2,562 tracked Bills of Lading loaded at Qingdao and discharged at Baltimore · planned port-to-port transit over 135 shipments · actual transit to discharge over 245 shipments with a recorded discharge · schedule slip vs plan over 20 shipments with both dates, across 9 sailings · data refreshed Nov 14, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Baltimore Shipping Time — Port to Port", data as of 2026-11-14, n = 2,562 tracked shipments. https://bexy.io/routes/qingdao-to-baltimore

Definitions, thresholds and limitations are on the methodology page.