Port-to-port route
Shipping from Qingdao to Felixstowe
Port of Qingdao, China → Port of Felixstowe, United Kingdom
Ocean freight from the Port of Qingdao to the Port of Felixstowe is one of the busiest port-to-port routes tracked on bexy, with 11,436 shipments on record loaded at Qingdao and discharged at Felixstowe. Planned port-to-port transit from Qingdao to Felixstowe has a median of 47 days (middle half 44–52 days, 90% within 58 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Felixstowe in the carrier's routing, across 880 shipments.
- Shipments tracked
- 11,436
- Median planned port-to-port
- 47 days
- Median actual transit
- 58 days
- Planned via a hub
- 0%
Planned port-to-port transit · Qingdao → Felixstowe
47days median
- Middle half
- 44–52 days
- 90% within
- 58 days
- Shipments
- 880
From the loaded-on-board date at Qingdao to the first planned arrival at Felixstowe in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
58days median
Middle half 54–59 days · 90% within 64 days · n = 743 shipments with a recorded discharge
Loaded on board at Qingdao → container discharged at Felixstowe, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.
Schedule slip vs plan
+4days median · after the planned arrival
Middle half +2 to +10 days · n = 155 shipments with both a planned arrival and a recorded discharge on this route, across 13 sailings
Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.
On the 155 shipments with both a planned arrival and a recorded discharge on this route, across 13 sailings, containers were discharged a median 4 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
Qingdao to Felixstowe ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Felixstowe — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 58 days (middle half 54–59 days, 90% within 64 days) across 743 shipments with a recorded discharge at the port of discharge. On the 155 shipments with both a planned arrival and a recorded discharge on this route, across 13 sailings, containers were discharged a median 4 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 880 Qingdao-to-Felixstowe shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
By place of receipt and delivery, this cargo travels mostly on the China to United Kingdom trade lane.
Track an Evergreen (EGLV) shipment from Qingdao to Felixstowe by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.
Trade lanes on this route
By place of receipt and delivery; the count is this route's shipments on each lane.
Planned routing: All 880 shipments with a planned routing to Felixstowe are planned direct from Qingdao. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · Qingdao → Felixstowe
- CAAU5725909 · Qingdao → Felixstowe
- EGSU9339096 · Qingdao → Felixstowe
- EITU1696670 · Qingdao → Felixstowe
- EGSU2303234 · Qingdao → Felixstowe2×
- CAAU5749773 · Qingdao → Felixstowe
- TLLU7973270 · Qingdao → Felixstowe2×
- EITU9000371 · Qingdao → Felixstowe
- TXGU5840624 · Qingdao → Felixstowe5×
- GAOU6408557 · Qingdao → Felixstowe
- EMCU8300824 · Qingdao → Felixstowe
- CAAU5781590 · Qingdao → Felixstowe
- EGSU8121561 · Qingdao → Felixstowe
Frequently asked questions
- How long does it take to ship from Qingdao to Felixstowe?
- Planned port-to-port transit from Qingdao to Felixstowe has a median of 47 days (middle half 44–52 days, 90% within 58 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Felixstowe in the carrier's routing, across 880 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Felixstowe adds time.
- How long does shipping from Qingdao to Felixstowe actually take?
- Actual transit from Qingdao to Felixstowe, from the carrier's container discharge events, has a median of 58 days (middle half 54–59 days, 90% within 64 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Felixstowe, across 743 shipments with a recorded discharge at Felixstowe. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Felixstowe is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. On the 155 shipments with both a planned arrival and a recorded discharge on this route, across 13 sailings, containers were discharged a median 4 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
- Is cargo from Qingdao to Felixstowe shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 880 Qingdao-to-Felixstowe shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- Which trade lanes use the Qingdao to Felixstowe route?
- By place of receipt and delivery, cargo loaded at Qingdao and discharged at Felixstowe travels mostly on the China to United Kingdom trade lane on bexy.
- How many shipments are tracked from Qingdao to Felixstowe?
- bexy has 11,436 shipments on record loaded at Qingdao and discharged at Felixstowe, the most recent departing Oct 16, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
- How do I track a shipment from Qingdao to Felixstowe?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse shipments from Qingdao to Felixstowe
by place of receipt and delivery · filterable by date & weight
More routes from Qingdao
Aggregated from 11,436 tracked Bills of Lading loaded at Qingdao and discharged at Felixstowe · planned port-to-port transit over 880 shipments · actual transit to discharge over 743 shipments with a recorded discharge · schedule slip vs plan over 155 shipments with both dates, across 13 sailings · data refreshed Oct 19, 2026 · how these figures are built.
Cite this page
bexy, "Qingdao to Felixstowe Shipping Time — Port to Port", data as of 2026-10-19, n = 11,436 tracked shipments. https://bexy.io/routes/qingdao-to-felixstoweDefinitions, thresholds and limitations are on the methodology page.