Trade lane

Shipping from China to United Kingdom

Ocean freight from China to United Kingdom is a high-volume container trade lane on bexy, with 36,876 shipments on record. Median estimated transit is 45 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 43 and 51 days and 90% at 58 days or less, across 3,741 shipments with a usable on-board date and estimated arrival.

Shipments tracked
36,876
Median est. transit
45 days
Loading ports
14
Discharge ports
8

Estimated transit · China → United Kingdom

45days median

Middle half
43–51 days
90% within
58 days
Shipments
3,741

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

56days median

Middle half 48–59 days · 90% within 61 days · n = 1,196 shipments with a recorded discharge

Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+3days median · after the planned arrival

Middle half +1 to +8 days · n = 199 shipments with both a planned arrival and a recorded discharge on this lane, across 24 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

On the 199 shipments with both a planned arrival and a recorded discharge on this lane, across 24 sailings, containers were discharged a median 3 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

China to United Kingdom ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from China to United Kingdom — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 56 days (middle half 48–59 days, 90% within 61 days) across 1,196 shipments with a recorded discharge at the port of discharge. On the 199 shipments with both a planned arrival and a recorded discharge on this lane, across 24 sailings, containers were discharged a median 3 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

Cargo on this lane loads mainly at China ports including Shanghai, Qingdao, Xingang and Xiamen and is discharged mainly at Felixstowe, Southampton, Belfast and Grangemouth on the United Kingdom side.

Every China-to-United Kingdom shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.

Busiest origin ports · China

Busiest destination ports · United Kingdom

Top port pairs · China → United Kingdom
Port of loading Port of discharge Shipments Share Planned port-to-port Slip vs plan Route page
ShanghaiFelixstowe16,20844%41 days median (39–45) · n = 478—Shanghai → Felixstowe
QingdaoFelixstowe11,43631%47 days median (44–52) · n = 880+4 days median · n = 155, 13 sailingsQingdao → Felixstowe
XingangFelixstowe2,0996%56 days median (50–62) · n = 32—Xingang → Felixstowe
ShanghaiSouthampton1,7535%39 days median (37–41) · n = 52—Shanghai → Southampton
XiamenFelixstowe1,5664%——Xiamen → Felixstowe
QingdaoSouthampton7352%55 days median (48–58) · n = 51—Qingdao → Southampton
NingboFelixstowe7112%47 days median (43–51) · n = 34—Ningbo → Felixstowe
QingdaoBelfast356<1%52 days median (45–58) · n = 35—Qingdao → Belfast

Share is of this lane's shipments that record both ports. Planned port-to-port is the median (and middle half) from the loaded-on-board date to the first planned arrival at the port of discharge in the carrier's routing — no inland leg, unlike the transit time above — shown when at least 20 shipments have both dates; n is how many of the pair's shipments it rests on. Slip vs plan is the median, per shipment, of the actual discharge day minus that planned arrival day, over the pair's shipments with both a planned arrival and a recorded discharge (negative means ahead of plan), shown when at least 20 such shipments across at least 5 sailings back it; n is how many shipments, and sailings how many vessel voyages carried them.

Planned routing: 5% of 1,690 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Rotterdam (83), Ningbo (2), Qingdao (1); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · China → United Kingdom

Frequently asked questions

How long does it take to ship from China to United Kingdom?
The median estimated transit from China to United Kingdom is 45 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 43 and 51 days and 90% at 58 days or less, across 3,741 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
How long does shipping from China to United Kingdom actually take?
The median actual transit from China to United Kingdom is 56 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 48 and 59 days and 90% took 61 days or less, across 1,196 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. On the 199 shipments with both a planned arrival and a recorded discharge on this lane, across 24 sailings, containers were discharged a median 3 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
Which ports handle China to United Kingdom shipments?
Cargo most often loads at Shanghai, Qingdao, Xingang and Xiamen. On arrival it is most often discharged at Felixstowe, Southampton, Belfast and Grangemouth.
Is cargo from China to United Kingdom shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 5% of the 1,690 China-to-United Kingdom shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Rotterdam, Ningbo and Qingdao; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
How many shipments are tracked on the China to United Kingdom route?
bexy has 36,876 shipments on record for the China to United Kingdom lane, the most recent departing Oct 17, 2026.
How do I track a China to United Kingdom shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 36,876 shipments

China → United Kingdom · filterable by port, date & weight

View shipments

Aggregated from 36,876 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 3,741 shipments · actual transit to discharge over 1,196 shipments with a recorded discharge · schedule slip vs plan over 199 shipments with both dates, across 24 sailings · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "China to United Kingdom Shipping — Transit Time", data as of 2026-10-19, n = 36,876 tracked shipments. https://bexy.io/shipping/china-to-united-kingdom

Definitions, thresholds and limitations are on the methodology page.