Trade lane

Shipping from China to Malaysia

Ocean freight from China to Malaysia is a high-volume container trade lane on bexy, with 34,672 shipments on record. Median estimated transit is 14 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 9 and 21 days and 90% at 36 days or less, across 1,063 shipments with a usable on-board date and estimated arrival.

Shipments tracked
34,672
Median est. transit
14 days
Loading ports
8
Discharge ports
14

Estimated transit · China → Malaysia

14days median

Middle half
9–21 days
90% within
36 days
Shipments
1,063

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

12days median

Middle half 10–19 days · 90% within 31 days · n = 770 shipments with a recorded discharge

Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+2days median · after the planned arrival

Middle half +1 to +3 days · n = 62 shipments with both a planned arrival and a recorded discharge on this lane, across 18 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

China to Malaysia ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from China to Malaysia — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 12 days (middle half 10–19 days, 90% within 31 days) across 770 shipments with a recorded discharge at the port of discharge.

Cargo on this lane loads mainly at China ports including Shanghai, Qingdao, Xingang and Xiamen and is discharged mainly at Pasir Gudang, Port Klang West Port, Port Klang North Port and Penang on the Malaysia side.

Every China-to-Malaysia shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.

Busiest origin ports · China

Top port pairs · China → Malaysia
Port of loading Port of discharge Shipments Share Planned port-to-port Route page
ShanghaiPasir Gudang9,12726%8 days median (7–8) · n = 146Shanghai → Pasir Gudang
ShanghaiPort Klang North Port4,63613%9 days median (8–10) · n = 79Shanghai → Port Klang North Port
ShanghaiPort Klang West Port3,44110%10 days median (9–10) · n = 85Shanghai → Port Klang West Port
QingdaoPasir Gudang2,0126%13 days median (11–17) · n = 91Qingdao → Pasir Gudang
XingangPort Klang West Port2,0116%——
ShanghaiTanjung Pelepas1,7775%11 days median (10–12) · n = 45Shanghai → Tanjung Pelepas
QingdaoPenang1,6655%19 days median (14–19) · n = 79Qingdao → Penang
QingdaoPort Klang West Port1,6255%15 days median (13–15) · n = 53Qingdao → Port Klang West Port

Share is of this lane's shipments that record both ports. Planned port-to-port is the median (and middle half) from the loaded-on-board date to the first planned arrival at the port of discharge in the carrier's routing — no inland leg, unlike the transit time above — shown when at least 20 shipments have both dates; n is how many of the pair's shipments it rests on.

Planned routing: 8% of 818 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Bintulu (23), Kaohsiung (15), Hong Kong (14); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · China → Malaysia

Frequently asked questions

How long does it take to ship from China to Malaysia?
The median estimated transit from China to Malaysia is 14 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 9 and 21 days and 90% at 36 days or less, across 1,063 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
How long does shipping from China to Malaysia actually take?
The median actual transit from China to Malaysia is 12 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 10 and 19 days and 90% took 31 days or less, across 770 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Which ports handle China to Malaysia shipments?
Cargo most often loads at Shanghai, Qingdao, Xingang and Xiamen. On arrival it is most often discharged at Pasir Gudang, Port Klang West Port, Port Klang North Port and Penang.
Is cargo from China to Malaysia shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 8% of the 818 China-to-Malaysia shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Bintulu, Kaohsiung and Hong Kong; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
How many shipments are tracked on the China to Malaysia route?
bexy has 34,672 shipments on record for the China to Malaysia lane, the most recent departing Oct 16, 2026.
How do I track a China to Malaysia shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 34,672 shipments

China → Malaysia · filterable by port, date & weight

View shipments

Aggregated from 34,672 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 1,063 shipments · actual transit to discharge over 770 shipments with a recorded discharge · schedule slip vs plan over 62 shipments with both dates, across 18 sailings · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "China to Malaysia Shipping — Transit Time", data as of 2026-10-19, n = 34,672 tracked shipments. https://bexy.io/shipping/china-to-malaysia

Definitions, thresholds and limitations are on the methodology page.