Port-to-port route

Shipping from Qingdao to Durban

Port of Qingdao, China → Port of Durban, South Africa

Ocean freight from the Port of Qingdao to the Port of Durban is a high-volume port-to-port route on bexy, with 2,100 shipments on record loaded at Qingdao and discharged at Durban. Planned port-to-port transit from Qingdao to Durban has a median of 38 days (middle half 31–62 days, 90% within 70 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Durban in the carrier's routing, across 198 shipments.

Shipments tracked
2,100
Median planned port-to-port
38 days
Median actual transit
62 days
Planned via a hub
7%

Planned port-to-port transit · Qingdao → Durban

38days median

Middle half
31–62 days
90% within
70 days
Shipments
198

From the loaded-on-board date at Qingdao to the first planned arrival at Durban in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

62days median

Middle half 31–73 days · 90% within 81 days · n = 71 shipments with a recorded discharge

Loaded on board at Qingdao → container discharged at Durban, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+5days median · after the planned arrival

Middle half +3 to +6 days · n = 26 shipments with both a planned arrival and a recorded discharge on this route, across 7 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 7 sailings, containers were discharged a median 5 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

Qingdao to Durban ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Durban — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 62 days (middle half 31–73 days, 90% within 81 days) across 71 shipments with a recorded discharge at the port of discharge. On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 7 sailings, containers were discharged a median 5 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

In the carrier's planned routing at the time bexy read each Bill of Lading, 7% of the 198 Qingdao-to-Durban shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Ningbo; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to South Africa trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Durban by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: 7% of 198 shipments with a planned routing to Durban are planned via a transshipment port, most often Ningbo (14); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Durban

Frequently asked questions

How long does it take to ship from Qingdao to Durban?
Planned port-to-port transit from Qingdao to Durban has a median of 38 days (middle half 31–62 days, 90% within 70 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Durban in the carrier's routing, across 198 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Durban adds time.
How long does shipping from Qingdao to Durban actually take?
Actual transit from Qingdao to Durban, from the carrier's container discharge events, has a median of 62 days (middle half 31–73 days, 90% within 81 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Durban, across 71 shipments with a recorded discharge at Durban. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Durban is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 7 sailings, containers were discharged a median 5 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
Is cargo from Qingdao to Durban shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 7% of the 198 Qingdao-to-Durban shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Ningbo; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Durban route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Durban travels mostly on the China to South Africa trade lane on bexy.
How many shipments are tracked from Qingdao to Durban?
bexy has 2,100 shipments on record loaded at Qingdao and discharged at Durban, the most recent departing Nov 2, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Durban?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Durban

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 2,100 tracked Bills of Lading loaded at Qingdao and discharged at Durban · planned port-to-port transit over 198 shipments · actual transit to discharge over 71 shipments with a recorded discharge · schedule slip vs plan over 26 shipments with both dates, across 7 sailings · data refreshed Nov 7, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Durban Shipping Time — Port to Port", data as of 2026-11-07, n = 2,100 tracked shipments. https://bexy.io/routes/qingdao-to-durban

Definitions, thresholds and limitations are on the methodology page.