Port-to-port route

Shipping from Qingdao to Guayaquil

Port of Qingdao, China → Port of Guayaquil, Ecuador

Ocean freight from the Port of Qingdao to the Port of Guayaquil is a tracked port-to-port route on bexy, with 249 shipments on record loaded at Qingdao and discharged at Guayaquil. Planned port-to-port transit from Qingdao to Guayaquil has a median of 56 days (middle half 49–64 days, 90% within 78 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Guayaquil in the carrier's routing, across 55 shipments.

Shipments tracked
249
Median planned port-to-port
56 days
Median actual transit
63 days
Planned via a hub
0%

Planned port-to-port transit · Qingdao → Guayaquil

56days median

Middle half
49–64 days
90% within
78 days
Shipments
55

From the loaded-on-board date at Qingdao to the first planned arrival at Guayaquil in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

63days median

Middle half 56–70 days · 90% within 73 days · n = 51 shipments with a recorded discharge

Loaded on board at Qingdao → container discharged at Guayaquil, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+7days median · after the planned arrival

Middle half 0 to +15 days · n = 26 shipments with both a planned arrival and a recorded discharge on this route, across 6 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 6 sailings, containers were discharged a median 7 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

Qingdao to Guayaquil ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Guayaquil — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 63 days (middle half 56–70 days, 90% within 73 days) across 51 shipments with a recorded discharge at the port of discharge. On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 6 sailings, containers were discharged a median 7 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 55 Qingdao-to-Guayaquil shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to Ecuador trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Guayaquil by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 55 shipments with a planned routing to Guayaquil are planned direct from Qingdao. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Guayaquil

Frequently asked questions

How long does it take to ship from Qingdao to Guayaquil?
Planned port-to-port transit from Qingdao to Guayaquil has a median of 56 days (middle half 49–64 days, 90% within 78 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Guayaquil in the carrier's routing, across 55 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Guayaquil adds time.
How long does shipping from Qingdao to Guayaquil actually take?
Actual transit from Qingdao to Guayaquil, from the carrier's container discharge events, has a median of 63 days (middle half 56–70 days, 90% within 73 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Guayaquil, across 51 shipments with a recorded discharge at Guayaquil. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Guayaquil is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. On the 26 shipments with both a planned arrival and a recorded discharge on this route, across 6 sailings, containers were discharged a median 7 days after the carrier's planned arrival at the port of discharge: the planned date is the carrier's plan as bexy read each Bill of Lading, and those schedules have slipped.
Is cargo from Qingdao to Guayaquil shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 55 Qingdao-to-Guayaquil shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Guayaquil route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Guayaquil travels mostly on the China to Ecuador trade lane on bexy.
How many shipments are tracked from Qingdao to Guayaquil?
bexy has 249 shipments on record loaded at Qingdao and discharged at Guayaquil, the most recent departing Oct 7, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Guayaquil?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Guayaquil

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 249 tracked Bills of Lading loaded at Qingdao and discharged at Guayaquil · planned port-to-port transit over 55 shipments · actual transit to discharge over 51 shipments with a recorded discharge · schedule slip vs plan over 26 shipments with both dates, across 6 sailings · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Guayaquil Shipping Time — Port to Port", data as of 2026-10-19, n = 249 tracked shipments. https://bexy.io/routes/qingdao-to-guayaquil

Definitions, thresholds and limitations are on the methodology page.