Port-to-port route
Shipping from Qingdao to Ho Chi Minh
Port of Qingdao, China → Port of Ho Chi Minh, Vietnam
Ocean freight from the Port of Qingdao to the Port of Ho Chi Minh is a high-volume port-to-port route on bexy, with 4,372 shipments on record loaded at Qingdao and discharged at Ho Chi Minh. Planned port-to-port transit from Qingdao to Ho Chi Minh has a median of 11 days (middle half 9–15 days, 90% within 15 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Ho Chi Minh in the carrier's routing, across 306 shipments.
- Shipments tracked
- 4,372
- Median planned port-to-port
- 11 days
- Median actual transit
- 13 days
- Planned via a hub
- 0%
Planned port-to-port transit · Qingdao → Ho Chi Minh
11days median
- Middle half
- 9–15 days
- 90% within
- 15 days
- Shipments
- 306
From the loaded-on-board date at Qingdao to the first planned arrival at Ho Chi Minh in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
13days median
Middle half 11–14 days · 90% within 15 days · n = 231 shipments with a recorded discharge
Loaded on board at Qingdao → container discharged at Ho Chi Minh, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.
Schedule slip vs plan
0days median · on the planned day
Middle half 0 to +1 days · n = 44 shipments with both a planned arrival and a recorded discharge on this route, across 13 sailings
Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.
Qingdao to Ho Chi Minh ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Ho Chi Minh — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 13 days (middle half 11–14 days, 90% within 15 days) across 231 shipments with a recorded discharge at the port of discharge.
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 307 Qingdao-to-Ho Chi Minh shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
By place of receipt and delivery, this cargo travels mostly on the China to Vietnam trade lane.
Track an Evergreen (EGLV) shipment from Qingdao to Ho Chi Minh by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.
Trade lanes on this route
By place of receipt and delivery; the count is this route's shipments on each lane.
Planned routing: All 307 shipments with a planned routing to Ho Chi Minh are planned direct from Qingdao. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · Qingdao → Ho Chi Minh
- TRHU4881785 · Qingdao → Ho Chi Minh
- CAAU2305230 · Qingdao → Ho Chi Minh24×
- EISU8261551 · Qingdao → Ho Chi Minh
- EGHU3481453 · Qingdao → Ho Chi Minh
- EGHU3450848 · Qingdao → Ho Chi Minh12×
- FYCU7042972 · Qingdao → Ho Chi Minh
- EMCU1778196 · Qingdao → Ho Chi Minh
- EGHU3278868 · Qingdao → Ho Chi Minh4×
- EGSU6366610 · Qingdao → Ho Chi Minh
- CAAU5752397 · Qingdao → Ho Chi Minh2×
- EISU2340519 · Qingdao → Ho Chi Minh
- TGBU4018030 · Qingdao → Ho Chi Minh4×
Frequently asked questions
- How long does it take to ship from Qingdao to Ho Chi Minh?
- Planned port-to-port transit from Qingdao to Ho Chi Minh has a median of 11 days (middle half 9–15 days, 90% within 15 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Ho Chi Minh in the carrier's routing, across 306 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Ho Chi Minh adds time.
- How long does shipping from Qingdao to Ho Chi Minh actually take?
- Actual transit from Qingdao to Ho Chi Minh, from the carrier's container discharge events, has a median of 13 days (middle half 11–14 days, 90% within 15 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Ho Chi Minh, across 231 shipments with a recorded discharge at Ho Chi Minh. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Ho Chi Minh is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
- Is cargo from Qingdao to Ho Chi Minh shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 307 Qingdao-to-Ho Chi Minh shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- Which trade lanes use the Qingdao to Ho Chi Minh route?
- By place of receipt and delivery, cargo loaded at Qingdao and discharged at Ho Chi Minh travels mostly on the China to Vietnam trade lane on bexy.
- How many shipments are tracked from Qingdao to Ho Chi Minh?
- bexy has 4,372 shipments on record loaded at Qingdao and discharged at Ho Chi Minh, the most recent departing Oct 16, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
- How do I track a shipment from Qingdao to Ho Chi Minh?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse shipments from Qingdao to Ho Chi Minh
by place of receipt and delivery · filterable by date & weight
More routes from Qingdao
Aggregated from 4,372 tracked Bills of Lading loaded at Qingdao and discharged at Ho Chi Minh · planned port-to-port transit over 306 shipments · actual transit to discharge over 231 shipments with a recorded discharge · schedule slip vs plan over 44 shipments with both dates, across 13 sailings · data refreshed Oct 19, 2026 · how these figures are built.
Cite this page
bexy, "Qingdao to Ho Chi Minh Shipping Time — Port to Port", data as of 2026-10-19, n = 4,372 tracked shipments. https://bexy.io/routes/qingdao-to-ho-chi-minhDefinitions, thresholds and limitations are on the methodology page.