Port-to-port route

Shipping from Qingdao to Surabaya

Port of Qingdao, China → Port of Surabaya, Indonesia

Ocean freight from the Port of Qingdao to the Port of Surabaya is an actively tracked port-to-port route on bexy, with 926 shipments on record loaded at Qingdao and discharged at Surabaya. Planned port-to-port transit from Qingdao to Surabaya has a median of 11 days (middle half 10–12 days, 90% within 14 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Surabaya in the carrier's routing, across 106 shipments.

Shipments tracked
926
Median planned port-to-port
11 days
Median actual transit
12 days
Planned via a hub
<1%

Planned port-to-port transit · Qingdao → Surabaya

11days median

Middle half
10–12 days
90% within
14 days
Shipments
106

From the loaded-on-board date at Qingdao to the first planned arrival at Surabaya in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

12days median

Middle half 11–13 days · 90% within 14 days · n = 112 shipments with a recorded discharge

Loaded on board at Qingdao → container discharged at Surabaya, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

0days median · on the planned day

Middle half 0 days · n = 26 shipments with both a planned arrival and a recorded discharge on this route, across 6 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

Qingdao to Surabaya ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Surabaya — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 12 days (middle half 11–13 days, 90% within 14 days) across 112 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, fewer than 1% of the 107 Qingdao-to-Surabaya shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Shekou; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to Indonesia trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Surabaya by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: <1% of 107 shipments with a planned routing to Surabaya are planned via a transshipment port, most often Shekou (1); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Surabaya

Frequently asked questions

How long does it take to ship from Qingdao to Surabaya?
Planned port-to-port transit from Qingdao to Surabaya has a median of 11 days (middle half 10–12 days, 90% within 14 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Surabaya in the carrier's routing, across 106 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Surabaya adds time.
How long does shipping from Qingdao to Surabaya actually take?
Actual transit from Qingdao to Surabaya, from the carrier's container discharge events, has a median of 12 days (middle half 11–13 days, 90% within 14 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Surabaya, across 112 shipments with a recorded discharge at Surabaya. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Surabaya is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Qingdao to Surabaya shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, fewer than 1% of the 107 Qingdao-to-Surabaya shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Shekou; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Surabaya route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Surabaya travels mostly on the China to Indonesia trade lane on bexy.
How many shipments are tracked from Qingdao to Surabaya?
bexy has 926 shipments on record loaded at Qingdao and discharged at Surabaya, the most recent departing Oct 10, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Surabaya?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Surabaya

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 926 tracked Bills of Lading loaded at Qingdao and discharged at Surabaya · planned port-to-port transit over 106 shipments · actual transit to discharge over 112 shipments with a recorded discharge · schedule slip vs plan over 26 shipments with both dates, across 6 sailings · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Surabaya Shipping Time — Port to Port", data as of 2026-10-19, n = 926 tracked shipments. https://bexy.io/routes/qingdao-to-surabaya

Definitions, thresholds and limitations are on the methodology page.