Shipping from Shanghai to Davao
Port of Shanghai, China → Port of Davao, Philippines
Ocean freight from the Port of Shanghai to the Port of Davao is an actively tracked port-to-port route on bexy, with 699 shipments on record loaded at Shanghai and discharged at Davao. Planned port-to-port transit from Shanghai to Davao has a median of 19 days (middle half 17–23 days, 90% within 41 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Davao in the carrier's routing, across 35 shipments.
- Shipments tracked
- 699
- Median planned port-to-port
- 19 days
- Median actual transit
- 18 days
- Planned via a hub
- 26%
Planned port-to-port transit · Shanghai → Davao
19days median
- Middle half
- 17–23 days
- 90% within
- 41 days
- Shipments
- 35
From the loaded-on-board date at Shanghai to the first planned arrival at Davao in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
18days median
Middle half 16–24 days · 90% within 30 days · n = 30 shipments with a recorded discharge
Loaded on board at Shanghai → container discharged at Davao, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.
Shanghai to Davao ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Davao — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 18 days (middle half 16–24 days, 90% within 30 days) across 30 shipments with a recorded discharge at the port of discharge.
In the carrier's planned routing at the time bexy read each Bill of Lading, 26% of the 35 Shanghai-to-Davao shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Hong Kong, Kaohsiung and Shekou; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
By place of receipt and delivery, this cargo travels mostly on the China to Philippines trade lane.
Track an Evergreen (EGLV) shipment from Shanghai to Davao by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.
Trade lanes on this route
By place of receipt and delivery; the count is this route's shipments on each lane.
Planned routing: 26% of 35 shipments with a planned routing to Davao are planned via a transshipment port, most often Hong Kong (5), Kaohsiung (3), Shekou (1); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · Shanghai → Davao
- EGSU1320026 · Shanghai → Davao
- EGSU1578345 · Shanghai → Davao12×
- TIIU5121669 · Shanghai → Davao2×
- EGSU6463400 · Shanghai → Davao4×
- EMCU8743083 · Shanghai → Davao2×
- EGSU1354469 · Shanghai → Davao10×
- EGSU2735840 · Shanghai → Davao
- EGSU2085024 · Shanghai → Davao
- EGHU3429141 · Shanghai → Davao
- EGSU9293225 · Shanghai → Davao2×
- EGSU2161675 · Shanghai → Davao2×
- TRHU7780952 · Shanghai → Davao
Frequently asked questions
- How long does it take to ship from Shanghai to Davao?
- Planned port-to-port transit from Shanghai to Davao has a median of 19 days (middle half 17–23 days, 90% within 41 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Davao in the carrier's routing, across 35 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Davao adds time.
- How long does shipping from Shanghai to Davao actually take?
- Actual transit from Shanghai to Davao, from the carrier's container discharge events, has a median of 18 days (middle half 16–24 days, 90% within 30 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Davao, across 30 shipments with a recorded discharge at Davao. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Davao is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
- Is cargo from Shanghai to Davao shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, 26% of the 35 Shanghai-to-Davao shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Hong Kong, Kaohsiung and Shekou; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- Which trade lanes use the Shanghai to Davao route?
- By place of receipt and delivery, cargo loaded at Shanghai and discharged at Davao travels mostly on the China to Philippines trade lane on bexy.
- How many shipments are tracked from Shanghai to Davao?
- bexy has 699 shipments on record loaded at Shanghai and discharged at Davao, the most recent departing Nov 8, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
- How do I track a shipment from Shanghai to Davao?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse shipments from Shanghai to Davao
by place of receipt and delivery · filterable by date & weight
More routes from Shanghai
More routes to Davao
Aggregated from 699 tracked Bills of Lading loaded at Shanghai and discharged at Davao · planned port-to-port transit over 35 shipments · actual transit to discharge over 30 shipments with a recorded discharge · data refreshed Nov 14, 2026 · how these figures are built.
Cite this page
bexy, "Shanghai to Davao Shipping Time — Port to Port", data as of 2026-11-14, n = 699 tracked shipments. https://bexy.io/routes/shanghai-to-davaoDefinitions, thresholds and limitations are on the methodology page.