Port-to-port route

Shipping from Shanghai to Jebel Ali

Port of Shanghai, China → Port of Jebel Ali, United Arab Emirates

Ocean freight from the Port of Shanghai to the Port of Jebel Ali is an actively tracked port-to-port route on bexy, with 1,901 shipments on record loaded at Shanghai and discharged at Jebel Ali. Planned port-to-port transit from Shanghai to Jebel Ali has a median of 20 days (middle half 18–21 days, 90% within 22 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Jebel Ali in the carrier's routing, across 35 shipments.

Shipments tracked
1,901
Median planned port-to-port
20 days
Median actual transit
23 days
Planned via a hub
0%

Planned port-to-port transit · Shanghai → Jebel Ali

20days median

Middle half
18–21 days
90% within
22 days
Shipments
35

From the loaded-on-board date at Shanghai to the first planned arrival at Jebel Ali in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

23days median

Middle half 22–23 days · 90% within 25 days · n = 20 shipments with a recorded discharge

Loaded on board at Shanghai → container discharged at Jebel Ali, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Shanghai to Jebel Ali ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Jebel Ali — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 23 days (middle half 22–23 days, 90% within 25 days) across 20 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 35 Shanghai-to-Jebel Ali shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to United Arab Emirates trade lane.

Track an Evergreen (EGLV) shipment from Shanghai to Jebel Ali by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 35 shipments with a planned routing to Jebel Ali are planned direct from Shanghai. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Shanghai → Jebel Ali

Frequently asked questions

How long does it take to ship from Shanghai to Jebel Ali?
Planned port-to-port transit from Shanghai to Jebel Ali has a median of 20 days (middle half 18–21 days, 90% within 22 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Jebel Ali in the carrier's routing, across 35 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Jebel Ali adds time.
How long does shipping from Shanghai to Jebel Ali actually take?
Actual transit from Shanghai to Jebel Ali, from the carrier's container discharge events, has a median of 23 days (middle half 22–23 days, 90% within 25 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Jebel Ali, across 20 shipments with a recorded discharge at Jebel Ali. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Jebel Ali is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Shanghai to Jebel Ali shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 35 Shanghai-to-Jebel Ali shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Shanghai to Jebel Ali route?
By place of receipt and delivery, cargo loaded at Shanghai and discharged at Jebel Ali travels mostly on the China to United Arab Emirates trade lane on bexy.
How many shipments are tracked from Shanghai to Jebel Ali?
bexy has 1,901 shipments on record loaded at Shanghai and discharged at Jebel Ali, the most recent departing Feb 11, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Shanghai to Jebel Ali?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Shanghai to Jebel Ali

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 1,901 tracked Bills of Lading loaded at Shanghai and discharged at Jebel Ali · planned port-to-port transit over 35 shipments · actual transit to discharge over 20 shipments with a recorded discharge · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Shanghai to Jebel Ali Shipping Time — Port to Port", data as of 2026-10-19, n = 1,901 tracked shipments. https://bexy.io/routes/shanghai-to-jebel-ali

Definitions, thresholds and limitations are on the methodology page.