Port-to-port route

Shipping from Shanghai to Le Havre

Port of Shanghai, China → Port of Le Havre, France

Ocean freight from the Port of Shanghai to the Port of Le Havre is a high-volume port-to-port route on bexy, with 6,988 shipments on record loaded at Shanghai and discharged at Le Havre. Planned port-to-port transit from Shanghai to Le Havre has a median of 38 days (middle half 37–40 days, 90% within 41 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Le Havre in the carrier's routing, across 144 shipments.

Shipments tracked
6,988
Median planned port-to-port
38 days
Median actual transit
39 days
Planned via a hub
0%

Planned port-to-port transit · Shanghai → Le Havre

38days median

Middle half
37–40 days
90% within
41 days
Shipments
144

From the loaded-on-board date at Shanghai to the first planned arrival at Le Havre in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

39days median

Middle half 37–43 days · 90% within 44 days · n = 153 shipments with a recorded discharge

Loaded on board at Shanghai → container discharged at Le Havre, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+1day median · after the planned arrival

Middle half −1 to +2 days · n = 23 shipments with both a planned arrival and a recorded discharge on this route, across 7 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

Shanghai to Le Havre ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Le Havre — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 39 days (middle half 37–43 days, 90% within 44 days) across 153 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 144 Shanghai-to-Le Havre shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to France trade lane.

Track an Evergreen (EGLV) shipment from Shanghai to Le Havre by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 144 shipments with a planned routing to Le Havre are planned direct from Shanghai. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Shanghai → Le Havre

Frequently asked questions

How long does it take to ship from Shanghai to Le Havre?
Planned port-to-port transit from Shanghai to Le Havre has a median of 38 days (middle half 37–40 days, 90% within 41 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Le Havre in the carrier's routing, across 144 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Le Havre adds time.
How long does shipping from Shanghai to Le Havre actually take?
Actual transit from Shanghai to Le Havre, from the carrier's container discharge events, has a median of 39 days (middle half 37–43 days, 90% within 44 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Le Havre, across 153 shipments with a recorded discharge at Le Havre. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Le Havre is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Shanghai to Le Havre shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 144 Shanghai-to-Le Havre shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Shanghai to Le Havre route?
By place of receipt and delivery, cargo loaded at Shanghai and discharged at Le Havre travels mostly on the China to France trade lane on bexy.
How many shipments are tracked from Shanghai to Le Havre?
bexy has 6,988 shipments on record loaded at Shanghai and discharged at Le Havre, the most recent departing Nov 9, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Shanghai to Le Havre?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Shanghai to Le Havre

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 6,988 tracked Bills of Lading loaded at Shanghai and discharged at Le Havre · planned port-to-port transit over 144 shipments · actual transit to discharge over 153 shipments with a recorded discharge · schedule slip vs plan over 23 shipments with both dates, across 7 sailings · data refreshed Nov 14, 2026 · how these figures are built.

Cite this page

bexy, "Shanghai to Le Havre Shipping Time — Port to Port", data as of 2026-11-14, n = 6,988 tracked shipments. https://bexy.io/routes/shanghai-to-le-havre

Definitions, thresholds and limitations are on the methodology page.