Port-to-port route

Shipping from Shanghai to Mombasa

Port of Shanghai, China → Port of Mombasa, Kenya

Ocean freight from the Port of Shanghai to the Port of Mombasa is a high-volume port-to-port route on bexy, with 4,248 shipments on record loaded at Shanghai and discharged at Mombasa. Planned port-to-port transit from Shanghai to Mombasa has a median of 22 days (middle half 20–24 days, 90% within 26 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Mombasa in the carrier's routing, across 109 shipments.

Shipments tracked
4,248
Median planned port-to-port
22 days
Median actual transit
23 days
Planned via a hub
0%

Planned port-to-port transit · Shanghai → Mombasa

22days median

Middle half
20–24 days
90% within
26 days
Shipments
109

From the loaded-on-board date at Shanghai to the first planned arrival at Mombasa in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

23days median

Middle half 23–26 days · 90% within 29 days · n = 94 shipments with a recorded discharge

Loaded on board at Shanghai → container discharged at Mombasa, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.

Shanghai to Mombasa ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Mombasa — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 23 days (middle half 23–26 days, 90% within 29 days) across 94 shipments with a recorded discharge at the port of discharge.

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 109 Shanghai-to-Mombasa shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to Kenya and China to Uganda trade lanes.

Track an Evergreen (EGLV) shipment from Shanghai to Mombasa by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 109 shipments with a planned routing to Mombasa are planned direct from Shanghai. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Shanghai → Mombasa

Frequently asked questions

How long does it take to ship from Shanghai to Mombasa?
Planned port-to-port transit from Shanghai to Mombasa has a median of 22 days (middle half 20–24 days, 90% within 26 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Mombasa in the carrier's routing, across 109 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Mombasa adds time.
How long does shipping from Shanghai to Mombasa actually take?
Actual transit from Shanghai to Mombasa, from the carrier's container discharge events, has a median of 23 days (middle half 23–26 days, 90% within 29 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Mombasa, across 94 shipments with a recorded discharge at Mombasa. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Mombasa is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Is cargo from Shanghai to Mombasa shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 109 Shanghai-to-Mombasa shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Shanghai to Mombasa route?
By place of receipt and delivery, cargo loaded at Shanghai and discharged at Mombasa travels mostly on the China to Kenya and China to Uganda trade lanes on bexy.
How many shipments are tracked from Shanghai to Mombasa?
bexy has 4,248 shipments on record loaded at Shanghai and discharged at Mombasa, the most recent departing Oct 11, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Shanghai to Mombasa?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Shanghai to Mombasa

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 4,248 tracked Bills of Lading loaded at Shanghai and discharged at Mombasa · planned port-to-port transit over 109 shipments · actual transit to discharge over 94 shipments with a recorded discharge · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Shanghai to Mombasa Shipping Time — Port to Port", data as of 2026-10-19, n = 4,248 tracked shipments. https://bexy.io/routes/shanghai-to-mombasa

Definitions, thresholds and limitations are on the methodology page.