Port-to-port route
Shipping from Shanghai to Puerto Quetzal
Port of Shanghai, China → Port of Puerto Quetzal, Guatemala
Ocean freight from the Port of Shanghai to the Port of Puerto Quetzal is an actively tracked port-to-port route on bexy, with 821 shipments on record loaded at Shanghai and discharged at Puerto Quetzal. Planned port-to-port transit from Shanghai to Puerto Quetzal has a median of 22 days (middle half 21–27 days, 90% within 33 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Puerto Quetzal in the carrier's routing, across 22 shipments.
- Shipments tracked
- 821
- Median planned port-to-port
- 22 days
- Median actual transit
- 30 days
- Planned via a hub
- 0%
Planned port-to-port transit · Shanghai → Puerto Quetzal
22days median
- Middle half
- 21–27 days
- 90% within
- 33 days
- Shipments
- 22
From the loaded-on-board date at Shanghai to the first planned arrival at Puerto Quetzal in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
30days median
Middle half 26–37 days · 90% within 41 days · n = 24 shipments with a recorded discharge
Loaded on board at Shanghai → container discharged at Puerto Quetzal, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.
Shanghai to Puerto Quetzal ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from Shanghai to Puerto Quetzal — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 30 days (middle half 26–37 days, 90% within 41 days) across 24 shipments with a recorded discharge at the port of discharge.
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 22 Shanghai-to-Puerto Quetzal shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
By place of receipt and delivery, this cargo travels mostly on the China to Guatemala trade lane.
Track an Evergreen (EGLV) shipment from Shanghai to Puerto Quetzal by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.
Trade lanes on this route
By place of receipt and delivery; the count is this route's shipments on each lane.
Planned routing: All 22 shipments with a planned routing to Puerto Quetzal are planned direct from Shanghai. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · Shanghai → Puerto Quetzal
- EGSU0290884 · Shanghai → Puerto Quetzal
- EGSU3863953 · Shanghai → Puerto Quetzal2×
- EGSU9198552 · Shanghai → Puerto Quetzal
- EGHU9316728 · Shanghai → Puerto Quetzal
- EITU9268148 · Shanghai → Puerto Quetzal2×
- EMCU8404500 · Shanghai → Puerto Quetzal5×
- EGSU1469386 · Shanghai → Puerto Quetzal → Guatemala City6×
- EMCU1680105 · Shanghai → Puerto Quetzal4×
- EGSU0399330 · Shanghai → Puerto Quetzal → Guatemala City
- TCKU6048430 · Shanghai → Puerto Quetzal → Guatemala City
- EGSU0392799 · Shanghai → Puerto Quetzal2×
- EMCU1516679 · Shanghai → Puerto Quetzal → Guatemala City
Frequently asked questions
- How long does it take to ship from Shanghai to Puerto Quetzal?
- Planned port-to-port transit from Shanghai to Puerto Quetzal has a median of 22 days (middle half 21–27 days, 90% within 33 days), an estimate measured from the loaded-on-board date at Shanghai to the first planned arrival at Puerto Quetzal in the carrier's routing, across 22 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Puerto Quetzal adds time.
- How long does shipping from Shanghai to Puerto Quetzal actually take?
- Actual transit from Shanghai to Puerto Quetzal, from the carrier's container discharge events, has a median of 30 days (middle half 26–37 days, 90% within 41 days), measured from the loaded-on-board date at Shanghai to the day a container was discharged at Puerto Quetzal, across 24 shipments with a recorded discharge at Puerto Quetzal. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Puerto Quetzal is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
- Is cargo from Shanghai to Puerto Quetzal shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 22 Shanghai-to-Puerto Quetzal shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- Which trade lanes use the Shanghai to Puerto Quetzal route?
- By place of receipt and delivery, cargo loaded at Shanghai and discharged at Puerto Quetzal travels mostly on the China to Guatemala trade lane on bexy.
- How many shipments are tracked from Shanghai to Puerto Quetzal?
- bexy has 821 shipments on record loaded at Shanghai and discharged at Puerto Quetzal, the most recent departing Nov 6, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
- How do I track a shipment from Shanghai to Puerto Quetzal?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse shipments from Shanghai to Puerto Quetzal
by place of receipt and delivery · filterable by date & weight
More routes from Shanghai
More routes to Puerto Quetzal
Aggregated from 821 tracked Bills of Lading loaded at Shanghai and discharged at Puerto Quetzal · planned port-to-port transit over 22 shipments · actual transit to discharge over 24 shipments with a recorded discharge · data refreshed Nov 22, 2026 · how these figures are built.
Cite this page
bexy, "Shanghai to Puerto Quetzal Shipping Time — Port to Port", data as of 2026-11-22, n = 821 tracked shipments. https://bexy.io/routes/shanghai-to-puerto-quetzalDefinitions, thresholds and limitations are on the methodology page.