Trade lane
Shipping from Germany to India
Ocean freight from Germany to India is a tracked container trade lane on bexy, with 243 shipments on record. Transit time depends on the carrier, service string and any transshipment along the way.
- Shipments tracked
- 243
- Avg est. transit
- —
- Loading ports
- 3
- Discharge ports
- 7
Germany to India ocean freight
Cargo on this lane loads mainly at Germany ports including Hamburg, Rotterdam and Antwerp and is discharged mainly at Nhava Sheva, Chennai, Mundra and Kolkata on the India side.
Every Germany-to-India shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.
Busiest destination ports · India
| Port of loading | Port of discharge | Shipments | Share | Planned port-to-port |
|---|---|---|---|---|
| Hamburg | Nhava Sheva | 89 | 37% | — |
| Hamburg | Chennai | 85 | 35% | — |
| Hamburg | Kolkata | 16 | 7% | — |
| Hamburg | Mundra | 16 | 7% | — |
| Rotterdam | Nhava Sheva | 11 | 5% | — |
| Hamburg | Tuticorin | 8 | 3% | — |
| Rotterdam | Chennai | 7 | 3% | — |
| Hamburg | Cochin | 6 | 2% | — |
Share is of this lane's shipments that record both ports.
Recent shipments · Germany → India
- EITU1566845 · Hamburg → Nhava Sheva
- EISU8581998 · Hamburg → Nhava Sheva
- CAAU5876736 · Hamburg → Nhava Sheva
- FYCU7044609 · Rotterdam → Nhava Sheva
- EITU3028366 · Rotterdam → Nhava Sheva
- EGSU3933691 · Hamburg → Nhava Sheva
- EMCU6101058 · Rotterdam → Nhava Sheva
- EGSU2084476 · Rotterdam → Nhava Sheva
- TRHU5073987 · Rotterdam → Nhava Sheva
- EMCU6564598 · Hamburg → Chennai4×
- EMCU6299555 · Hamburg → Chennai
- EITU1768912 · Hamburg → Nhava Sheva
Frequently asked questions
- How long does it take to ship from Germany to India?
- Transit time on the Germany to India lane varies by carrier and service. bexy shows the carrier's current ETD and ETA for each Bill of Lading, so you can see the estimate for a specific shipment.
- Which ports handle Germany to India shipments?
- Cargo most often loads at Hamburg, Rotterdam and Antwerp. On arrival it is most often discharged at Nhava Sheva, Chennai, Mundra and Kolkata.
- How many shipments are tracked on the Germany to India route?
- bexy has 243 shipments on record for the Germany to India lane, the most recent departing Jul 2, 2026.
- How do I track a Germany to India shipment?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse all 243 shipments
Germany → India · filterable by port, date & weight
Aggregated from 243 tracked Bills of Lading · data refreshed Oct 19, 2026 · how these figures are built.
Cite this page
bexy, "Germany to India Shipping — Transit Time", data as of 2026-10-19, n = 243 tracked shipments. https://bexy.io/shipping/germany-to-indiaDefinitions, thresholds and limitations are on the methodology page.