Country hub · imports · PL

Shipping to Poland

Ocean freight to Poland is tracked on bexy across 2 trade lanes and 11,939 shipments, with China and Turkey the largest origins.

Trade lanes
2
Shipments tracked
11,939
Median est. transit
53 days
Port pages
3

Middle half 50–58 days · 90% within 66 days · 1,062 shipments measured · volume-weighted across the lanes with at least 20 measured shipments, which carry more than 99% of the shipments · estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none

Actual transit (from carrier discharge events)

55days median

Middle half 51–63 days · 90% within 71 days · n = 267 shipments with a recorded discharge · volume-weighted across the lanes with at least 20 recorded discharges, which carry more than 99% of the shipments

Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+2days median · after the planned arrival

Middle half 0 to +3 days · n = 22 shipments with both a planned arrival and a recorded discharge on these lanes, across 9 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

Poland ocean freight imports

Median estimated transit is 53 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 50 and 58 days and 90% at 66 days or less, across 1,062 shipments with a usable on-board date and estimated arrival. It weights each lane by its shipment volume, over the lanes with at least 20 measured shipments, which carry more than 99% of the shipments.

Measured from the carrier's container events instead of its estimates, the actual transit to Poland — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 55 days (middle half 51–63 days, 90% within 71 days) across 267 shipments with a recorded discharge at the port of discharge. It weights each lane by its shipment volume, over the lanes with at least 20 recorded discharges, which carry more than 99% of the shipments.

Import cargo into Poland is mainly discharged at Gdansk, Gdynia and Szczecin.

Every shipment on these lanes travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until arrival, for up to 30 days — free, and without an account.

Routes to Poland

Recent shipments to Poland

Frequently asked questions

How long does shipping to Poland take?
The median estimated transit to Poland is 53 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 50 and 58 days and 90% at 66 days or less, across 1,062 shipments with a usable on-board date and estimated arrival. It weights each lane by its shipment volume, over the lanes with at least 20 measured shipments, which carry more than 99% of the shipments.
How long does shipping to Poland actually take?
The median actual transit to Poland is 55 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 51 and 63 days and 90% took 71 days or less, across 267 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown. It weights each lane by its shipment volume, over the lanes with at least 20 recorded discharges, which carry more than 99% of the shipments.
Which countries ship the most to Poland?
The largest origins for cargo arriving in Poland are China and Turkey.
Which ports handle Poland's imports?
Import cargo is mainly discharged at Gdansk, Gdynia and Szczecin.
How many shipments to Poland does bexy track?
bexy has 11,939 shipments on record bound for Poland across 2 trade lanes, the most recent departing Oct 4, 2026.
How do I track a shipment to Poland?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 11,939 shipments

Shipping to Poland · filterable by port, date & weight

View shipments

Aggregated from 11,939 tracked Bills of Lading across 2 lanes · volume-weighted median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none · volume-weighted actual transit to discharge over 267 shipments with a recorded discharge · schedule slip vs plan over 22 shipments with both dates, across 9 sailings · data refreshed Oct 6, 2026 · how these figures are built.

Cite this page

bexy, "Shipping to Poland — Ocean Routes & Transit Times", data as of 2026-10-06, n = 11,939 tracked shipments. https://bexy.io/shipping/to/poland

Definitions, thresholds and limitations are on the methodology page.