Back to search

Arrived EVER ARM 1412-016W (長為輪)

Evergreen

GAOU6256644 + 2 more · Shanghai → Tallinn

Bill of Lading 1406••••••••

EGLV•••••••••••••

PORT/PORT
3×
Planned transshipment: Rotterdam
ETDAug 6, 2026
ETASep 22, 2026

data as of

SHANGHAI[CN]TALLINN[EE]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
47 days
On board → last planned arrival at Tallinn

Shipment summary

This Evergreen shipment from Shanghai, China to Tallinn, Estonia was loaded on board on Aug 6, 2026 at the Port of Shanghai aboard EVER ARM 1412-016W (長為輪) and was due at the Port of Tallinn on Sep 22, 2026. That is about 47 days from loading to arrival.

The shipment moves 3 containers, GAOU6256644, GCXU6059457 and EGSU6482122 (3 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 31,596.990 KGS. The most recent container event is "Discharged from EVER ARM 1412-016W and waiting for transshipping at ROTTERDAM (NL)" on Sep 22, 2026.

Cargo loads at the Port of Shanghai, calls at Rotterdam and is discharged at the Port of Tallinn before final delivery to Tallinn, Estonia.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [CN]Port of loadingSHANGHAIAug 6, 2026EVER ARM 1412-016W (長為輪)
  2. [NL]TransshipmentROTTERDAMSep 16, 2026EVER ARM 1412-016W
  3. [EE]DeliveryTALLINNSep 22, 2026

Voyage timeline

  1. SHANGHAI[CN]Aug 6, 2026

    EVER ARM 1412-016W (長為輪)

    Port of loading
  2. ROTTERDAM[NL]Sep 16, 2026

    EVER ARM 1412-016W

    Transshipment
  3. TALLINN[EE]Sep 22, 2026
    Current position

Shipment facts

Containers
3
Gross weight
31,596.990 KGS
Manifest qty
2,922 PIECES
Measurement
195.0000 CBM
Vessel / voyage
EVER ARM 1412-016W (長為輪)
BL no.
EGLV•••••••••••••
On-board date
Aug 6, 2026

Containers
3

3 × 40'(SH)

GlossarySize/typeFCLVGMStatusWhat these statuses mean

GAOU6256644
40'(SH)
FCL/FCL 984 PIECESVGM 14148.65 KGSS/N EMCVNY6824

Discharged from EVER ARM 1412-016W and waiting for transshipping at ROTTERDAM (NL)

Sep 21, 2026

GCXU6059457
40'(SH)
FCL/FCL 1,132 PIECESVGM 14770.96 KGSS/N EMCVNQ6524

Discharged from EVER ARM 1412-016W and waiting for transshipping at ROTTERDAM (NL)

Sep 22, 2026

EGSU6482122
40'(SH)
FCL/FCL 806 PIECESVGM 13777.38 KGSS/N EMCVNS9074

Discharged from EVER ARM 1412-016W and waiting for transshipping at ROTTERDAM (NL)

Sep 21, 2026

Track another shipment

BL▸