Evergreen
EMCU0182427 · Xingang → Belawan
EGLV•••••••••••••
- Scheduled transit
- 26 days
- On board → ETA at Belawan
Source: bexy, https://bexy.io/track/6a83697b45668338b90184a7
Shipment summary
This Evergreen shipment from Xingang, China to Belawan, Indonesia was loaded on board on Aug 18, 2026 at the Port of Xingang aboard EVER LYRIC 076W (長頌輪) and was due to arrive at the Port of Belawan on Sep 13, 2026, per carrier data as of Sep 6, 2026. That is about 26 days from loading to arrival.
The shipment moves 1 container, EMCU0182427 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 28,100.000 KGS. The most recent container event is "Discharged from EVER LYRIC 076W and waiting for transshipping at PORT KLANG WEST PORT (MY)" on Aug 31, 2026.
Cargo loads at the Port of Xingang and is discharged at the Port of Belawan before final delivery to Belawan, Indonesia.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingXINGANGAug 18, 2026EVER LYRIC 076W (長頌輪)
- [ID]DeliveryBELAWANSep 13, 2026
Voyage timeline
- XINGANG[CN]Aug 18, 2026
EVER LYRIC 076W (長頌輪)
Port of loading - BELAWAN[ID]Sep 13, 2026Expected position (by schedule)
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 28,100.000 KGS
- Manifest qty
- 40 BAGS
- Measurement
- 50.0000 CBM
- Vessel / voyage
- EVER LYRIC 076W (長頌輪)
- BL no.
- EGLV•••••••••••••
- On-board date
- Aug 18, 2026
Containers 1
Discharged from EVER LYRIC 076W and waiting for transshipping at PORT KLANG WEST PORT (MY)
Aug 31, 2026