Evergreen
EMCU1687500 · Shanghai → Shanghai
EGLV•••••••••••••
- Scheduled transit
- 65 days
- On board → ETA at Shanghai
- To go
- 10 days
- Until the ETA at Shanghai, by schedule
Source: bexy, https://bexy.io/track/6ac313ca73bc5acea406a999
Shipment summary
This Evergreen shipment from Shanghai, China to Shanghai, China was loaded on board on Aug 25, 2026 at the Port of Shanghai aboard KMTC MOMBASA 2605W and is expected at the Port of Shanghai on Oct 29, 2026. That is about 65 days from loading to arrival.
The shipment moves 1 container, EMCU1687500 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 23,498.200 KGS. The most recent container event is "Transship container loaded on outbound vessel EVER LUNAR 082E at KARACHI (PK)" on Oct 8, 2026.
Cargo loads at the Port of Shanghai and is discharged at the Port of Shanghai before final delivery to Shanghai, China.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]DeliverySHANGHAIOct 29, 2026KMTC MOMBASA 2605W
Voyage timeline
- SHANGHAI[CN]Oct 29, 2026
KMTC MOMBASA 2605W
Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 23,498.200 KGS
- Manifest qty
- 141 PACKAGES
- Measurement
- 60.0000 CBM
- Vessel / voyage
- KMTC MOMBASA 2605W
- BL no.
- EGLV•••••••••••••
- On-board date
- Aug 25, 2026
Containers 1
Transship container loaded on outbound vessel EVER LUNAR 082E at KARACHI (PK)
Oct 8, 2026