Back to search

In transit (by schedule) · 41% KOTA ELOK 002W

Evergreen

EGSU8226686 · Shanghai → Santos

Bill of Lading 1426••••••••

EGLV•••••••••••••

PORT/PORT
1×
ETDOct 8, 2026
ETANov 6, 2026

data as of

SHANGHAI[CN]SANTOS[BR]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
29 days
On board → ETA at Santos
To go
18 days
Until the ETA at Santos, by schedule

Shipment summary

This Evergreen shipment from Shanghai, China to Santos, Brazil was scheduled to load on board on Oct 8, 2026 at the Port of Shanghai aboard KOTA ELOK 002W, with arrival at the Port of Santos expected on Nov 6, 2026, per carrier data as of Oct 7, 2026. That is about 29 days from loading to arrival.

The shipment moves 1 container, EGSU8226686 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 6,310.000 KGS. The most recent container event is "Received (FCL) at SHANGHAI (CN)" on Oct 5, 2026.

Cargo loads at the Port of Shanghai and is discharged at the Port of Santos before final delivery to Santos, Brazil.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [CN]Port of loadingSHANGHAIOct 8, 2026KOTA ELOK 002W
  2. [BR]DeliverySANTOSNov 6, 2026

Voyage timeline

  1. SHANGHAI[CN]Oct 8, 2026

    KOTA ELOK 002W

    Departed (by schedule)
  2. SANTOS[BR]Nov 6, 2026
    Delivery

Shipment facts

Containers
1
Gross weight
6,310.000 KGS
Manifest qty
13 PACKAGES
Measurement
65.0000 CBM
Vessel / voyage
KOTA ELOK 002W
BL no.
EGLV•••••••••••••
On-board date
Oct 8, 2026
EGSU8226686
40'(SH)
FCL/FCL 13 PACKAGESVGM 10060 KGSS/N EMCFUR9355

Received (FCL) at SHANGHAI (CN)

Oct 5, 2026

Track another shipment

BL▸