Trade lane

Shipping from China to Brazil

Ocean freight from China to Brazil is a high-volume container trade lane on bexy, with 12,375 shipments on record. Median estimated transit is 43 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 37 and 53 days and 90% at 69 days or less, across 1,148 shipments with a usable on-board date and estimated arrival.

Shipments tracked
12,375
Median est. transit
43 days
Loading ports
13
Discharge ports
8

Estimated transit · China → Brazil

43days median

Middle half
37–53 days
90% within
69 days
Shipments
1,148

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

49days median

Middle half 40–62 days · 90% within 85 days · n = 472 shipments with a recorded discharge

Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

+2days median · after the planned arrival

Middle half 0 to +3 days · n = 116 shipments with both a planned arrival and a recorded discharge on this lane, across 20 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

China to Brazil ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from China to Brazil — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 49 days (middle half 40–62 days, 90% within 85 days) across 472 shipments with a recorded discharge at the port of discharge.

Cargo on this lane loads mainly at China ports including Shanghai, Qingdao, Xingang and Ningbo and is discharged mainly at Santos, Navegantes, Paranagua and Itapoa on the Brazil side.

Every China-to-Brazil shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until arrival, for up to 30 days — free, and without an account.

Busiest origin ports · China

Busiest destination ports · Brazil

Top port pairs · China → Brazil
Port of loading Port of discharge Shipments Share Planned port-to-port Slip vs plan
ShanghaiSantos3,35827%33 days median (32–36) · n = 114—
ShanghaiNavegantes2,33519%39 days median (36–69) · n = 64—
ShanghaiParanagua1,51412%41 days median (32–49) · n = 31—
QingdaoSantos1,0248%41 days median (39–46) · n = 232+3 days median · n = 32, 10 sailings
QingdaoNavegantes7726%47 days median (43–68) · n = 218—
ShanghaiItapoa5354%——
XingangSantos4704%——
ShanghaiRio De Janeiro3643%——

Share is of this lane's shipments that record both ports. Planned port-to-port is the median (and middle half) from the loaded-on-board date to the first planned arrival at the port of discharge in the carrier's routing — no inland leg, unlike the transit time above — shown when at least 20 shipments have both dates; n is how many of the pair's shipments it rests on. Slip vs plan is the median, per shipment, of the actual discharge day minus that planned arrival day, over the pair's shipments with both a planned arrival and a recorded discharge (negative means ahead of plan), shown when at least 20 such shipments across at least 5 sailings back it; n is how many shipments, and sailings how many vessel voyages carried them.

Planned routing: 2% of 864 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Itajai (7), Ningbo (7), Hong Kong (5); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · China → Brazil

Frequently asked questions

How long does it take to ship from China to Brazil?
The median estimated transit from China to Brazil is 43 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 37 and 53 days and 90% at 69 days or less, across 1,148 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
How long does shipping from China to Brazil actually take?
The median actual transit from China to Brazil is 49 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 40 and 62 days and 90% took 85 days or less, across 472 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Which ports handle China to Brazil shipments?
Cargo most often loads at Shanghai, Qingdao, Xingang and Ningbo. On arrival it is most often discharged at Santos, Navegantes, Paranagua and Itapoa.
Is cargo from China to Brazil shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 2% of the 864 China-to-Brazil shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Itajai, Ningbo and Hong Kong; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
How many shipments are tracked on the China to Brazil route?
bexy has 12,375 shipments on record for the China to Brazil lane, the most recent departing Oct 6, 2026.
How do I track a China to Brazil shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 12,375 shipments

China → Brazil · filterable by port, date & weight

View shipments

Aggregated from 12,375 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 1,148 shipments · actual transit to discharge over 472 shipments with a recorded discharge · schedule slip vs plan over 116 shipments with both dates, across 20 sailings · data refreshed Oct 6, 2026 · how these figures are built.

Cite this page

bexy, "China to Brazil Shipping — Transit Time", data as of 2026-10-06, n = 12,375 tracked shipments. https://bexy.io/shipping/china-to-brazil

Definitions, thresholds and limitations are on the methodology page.