Ocean freight from the Port of Qingdao to the Port of Santos is an actively tracked port-to-port route on bexy, with 1,340 shipments on record loaded at Qingdao and discharged at Santos. Planned port-to-port transit from Qingdao to Santos has a median of 41 days (middle half 39–46 days, 90% within 52 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Santos in the carrier's routing, across 248 shipments.
- Shipments tracked
- 1,340
- Median planned port-to-port
- 41 days
- Median actual transit
- 45 days
- Planned via a hub
- 1%
Planned port-to-port transit · Qingdao → Santos
41days median
- Middle half
- 39–46 days
- 90% within
- 52 days
- Shipments
- 248
From the loaded-on-board date at Qingdao to the first planned arrival at Santos in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
45days median
Middle half 41–49 days · 90% within 62 days · n = 130 shipments with a recorded discharge
Loaded on board at Qingdao → container discharged at Santos, from the carrier's container events: actual dates, not estimates, for only the shipments whose discharge is on record — most Bills of Lading are read after the container has been returned empty.
Schedule slip vs plan
+2days median · after the planned arrival
Middle half +1 to +3 days · n = 43 shipments with both a planned arrival and a recorded discharge on this route, across 16 sailings
Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.
Qingdao to Santos ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from Qingdao to Santos — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 45 days (middle half 41–49 days, 90% within 62 days) across 130 shipments with a recorded discharge at the port of discharge.
In the carrier's planned routing at the time bexy read each Bill of Lading, 1% of the 248 Qingdao-to-Santos shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Ningbo; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
By place of receipt and delivery, this cargo travels mostly on the China to Brazil trade lane.
Track an Evergreen (EGLV) shipment from Qingdao to Santos by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.
Trade lanes on this route
By place of receipt and delivery; the count is this route's shipments on each lane.
Planned routing: 1% of 248 shipments with a planned routing to Santos are planned via a transshipment port, most often Ningbo (3); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · Qingdao → Santos
- EMCU5507211 · Qingdao → Santos
- TGBU4036389 · Qingdao → Santos
- EGSU5087458 · Qingdao → Santos3×
- EGHU9417087 · Qingdao → Santos
- EMCU5676891 · Qingdao → Santos
- EMCU5982058 · Qingdao → Santos
- EMCU5499203 · Qingdao → Santos
- EMCU5485832 · Qingdao → Santos
- GAOU7219223 · Qingdao → Santos2×
- EMCU5491671 · Qingdao → Santos4×
- EGSU5080094 · Qingdao → Santos2×
- EGSU0257741 · Qingdao → Santos4×
Frequently asked questions
- How long does it take to ship from Qingdao to Santos?
- Planned port-to-port transit from Qingdao to Santos has a median of 41 days (middle half 39–46 days, 90% within 52 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Santos in the carrier's routing, across 248 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Santos adds time.
- How long does shipping from Qingdao to Santos actually take?
- Actual transit from Qingdao to Santos, from the carrier's container discharge events, has a median of 45 days (middle half 41–49 days, 90% within 62 days), measured from the loaded-on-board date at Qingdao to the day a container was discharged at Santos, across 130 shipments with a recorded discharge at Santos. These are actual dates from the carrier's container events, not estimates, port to port, and any inland leg after discharge adds time. They cover only shipments whose discharge at Santos is on record: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
- Is cargo from Qingdao to Santos shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, 1% of the 248 Qingdao-to-Santos shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Ningbo; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- Which trade lanes use the Qingdao to Santos route?
- By place of receipt and delivery, cargo loaded at Qingdao and discharged at Santos travels mostly on the China to Brazil trade lane on bexy.
- How many shipments are tracked from Qingdao to Santos?
- bexy has 1,340 shipments on record loaded at Qingdao and discharged at Santos, the most recent departing Oct 28, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
- How do I track a shipment from Qingdao to Santos?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse shipments from Qingdao to Santos
by place of receipt and delivery · filterable by date & weight
More routes from Qingdao
More routes to Santos
Aggregated from 1,340 tracked Bills of Lading loaded at Qingdao and discharged at Santos · planned port-to-port transit over 248 shipments · actual transit to discharge over 130 shipments with a recorded discharge · schedule slip vs plan over 43 shipments with both dates, across 16 sailings · data refreshed Nov 14, 2026 · how these figures are built.
Cite this page
bexy, "Qingdao to Santos Shipping Time — Port to Port", data as of 2026-11-14, n = 1,340 tracked shipments. https://bexy.io/routes/qingdao-to-santosDefinitions, thresholds and limitations are on the methodology page.