Back to search

Arrived (by schedule)EVER ECLAT 0831-001W (長就輪)

Evergreen

EMCU8779126 + 1 more · Shanghai → Batam

Bill of Lading 1426••••••••

EGLV•••••••••••••

PORT/DOOR
2×
Planned transshipment: Singapore
ETDOct 1, 2026
ETAOct 22, 2026

data as of

SHANGHAI[CN]BATAM[ID]
Place of receipt Place of delivery
ETD
ETA
Scheduled transit
21 days
On board → ETA at Batam

Shipment summary

This Evergreen shipment from Shanghai, China to Batam, Indonesia was loaded on board on Oct 1, 2026 at the Port of Shanghai aboard EVER ECLAT 0831-001W (長就輪) and is expected at the Port of Batam on Oct 22, 2026. That is about 21 days from loading to arrival.

The shipment moves 2 containers, EMCU8779126 and EGSU2206770 (1 × 40'(SH), 1 × 20'(SD)), booked PORT/DOOR, with a declared gross weight of 32,000.000 KGS. The most recent container event is "Loaded (FCL) on EVER ECLAT 0831-001W at SHANGHAI (CN)" on Sep 30, 2026.

Cargo loads at the Port of Shanghai, calls at Singapore and is discharged at the Port of Batam before final delivery to Batam, Indonesia.

Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.

Carrier data as of .

Voyage route

  1. [CN]Port of loadingSHANGHAIOct 1, 2026EVER ECLAT 0831-001W (長就輪)
  2. [SG]TransshipmentSINGAPOREOct 14, 2026EVER ECLAT 0831-001W
  3. [ID]DeliveryBATAMOct 18, 2026EVER COPE 0076-126S

Voyage timeline

  1. SHANGHAI[CN]Oct 1, 2026

    EVER ECLAT 0831-001W (長就輪)

    Port of loading
  2. SINGAPORE[SG]Oct 14, 2026

    EVER ECLAT 0831-001W

    Transshipment
  3. BATAM[ID]Oct 18, 2026

    EVER COPE 0076-126S

    Expected position (by schedule)

Shipment facts

Containers
2
Gross weight
32,000.000 KGS
Manifest qty
26 PACKAGES
Measurement
71.6400 CBM
Vessel / voyage
EVER ECLAT 0831-001W (長就輪)
BL no.
EGLV•••••••••••••
On-board date
Oct 1, 2026

Containers
2

1 × 40'(SH) · 1 × 20'(SD)

GlossarySize/typeFCLVGMStatusWhat these statuses mean

EMCU8779126
40'(SH)
FCL/FCL 16 PACKAGESVGM 28650 KGSS/N EMCVQL9654

Loaded (FCL) on EVER ECLAT 0831-001W at SHANGHAI (CN)

Sep 30, 2026

EGSU2206770
20'(SD)
FCL/FCL 10 PACKAGESVGM 9220 KGSS/N EMCVQP4684

Loaded (FCL) on EVER ECLAT 0831-001W at SHANGHAI (CN)

Sep 30, 2026

Track another shipment

BL▸