Evergreen
EMCU5953527 · Rotterdam → Bintulu
EGLV•••••••••••••
- Scheduled transit
- 60 days
- On board → ETA at Bintulu
- To go
- 41 days
- Until the ETA at Bintulu, by schedule
Source: bexy, https://bexy.io/track/6ae175f876ea91565d04ac72
Shipment summary
This Evergreen shipment from Rotterdam, Netherlands to Bintulu, Malaysia was scheduled to load on board on Nov 3, 2026 at the Port of Rotterdam aboard EVER ATOP 1415-014E (長皇輪), with arrival at the Port of Bintulu expected on Jan 2, 2027, per carrier data as of Oct 28, 2026. That is about 60 days from loading to arrival.
The shipment moves 1 container, EMCU5953527 (1 × 40'(RH)), booked PORT/PORT, with a declared gross weight of 29,200.000 KGS. The most recent container event is "Received (FCL) at ROTTERDAM (NL)" on Oct 27, 2026.
Cargo loads at the Port of Rotterdam and is discharged at the Port of Bintulu before final delivery to Bintulu, Malaysia.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [NL]Port of loadingROTTERDAMNov 3, 2026EVER ATOP 1415-014E (長皇輪)
- [MY]DeliveryBINTULUJan 2, 2027
Voyage timeline
- ROTTERDAM[NL]Nov 3, 2026
EVER ATOP 1415-014E (長皇輪)
Departed (by schedule) - BINTULU[MY]Jan 2, 2027Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 29,200.000 KGS
- Manifest qty
- 2,800 CARTONS
- Measurement
- 55.0000 CBM
- Vessel / voyage
- EVER ATOP 1415-014E (長皇輪)
- BL no.
- EGLV•••••••••••••
- On-board date
- Nov 3, 2026
Containers 1
Received (FCL) at ROTTERDAM (NL)
Oct 27, 2026