Evergreen
EMCU6506781 · Weiterstadt → Keelung
EGLV•••••••••••••
- Scheduled transit
- 49 days
- On board → ETA at Keelung
- To go
- 18 days
- Until the ETA at Keelung, by schedule
Source: bexy, https://bexy.io/track/6ae191eba5bba5a6940f1e43
Shipment summary
This Evergreen shipment from Weiterstadt, Germany to Keelung, Taiwan was loaded on board on Oct 24, 2026 at the Port of Rotterdam aboard EVER MEGA 0828-012E (長兆輪) and is expected at Keelung, the place of delivery, on Dec 12, 2026. That is about 49 days from loading to arrival.
The shipment moves 1 container, EMCU6506781 (1 × 20'(SD)), booked DOOR/PORT, with a declared gross weight of 15,752.000 KGS. The most recent container event is "Loaded (FCL) on EVER MEGA 0828-012E at ROTTERDAM (NL)" on Oct 21, 2026.
Cargo loads at the Port of Rotterdam and is discharged at the Port of Taipei before final delivery to Keelung, Taiwan.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [DE]ReceiptWEITERSTADTOct 24, 2026
- [NL]Port of loadingROTTERDAMOct 24, 2026EVER MEGA 0828-012E (長兆輪)
- [TW]Port of dischargeTAIPEI—
- [TW]DeliveryKEELUNGDec 12, 2026
Voyage timeline
- WEITERSTADT[DE]Oct 24, 2026Receipt
- ROTTERDAM[NL]Oct 24, 2026
EVER MEGA 0828-012E (長兆輪)
Departed - TAIPEI[TW]—Port of discharge
- KEELUNG[TW]Dec 12, 2026Delivery
Shipment facts
- Service mode
- DOOR/PORT
- Containers
- 1
- Gross weight
- 15,752.000 KGS
- Manifest qty
- 20 PALLETS
- Measurement
- 27.0060 CBM
- Vessel / voyage
- EVER MEGA 0828-012E (長兆輪)
- BL no.
- EGLV•••••••••••••
- On-board date
- Oct 24, 2026
Containers 1
Loaded (FCL) on EVER MEGA 0828-012E at ROTTERDAM (NL)
Oct 21, 2026