Evergreen
TXGU5761438 · Xingang → Rotterdam
EGLV•••••••••••••
- Scheduled transit
- 48 days
- On board → ETA at Rotterdam
- To go
- 5 days
- Until the ETA at Rotterdam, by schedule
Source: bexy, https://bexy.io/track/6aee90af0d554d3dc40a479f
Shipment summary
This Evergreen shipment from Xingang, China to Rotterdam, Netherlands was loaded on board on Oct 10, 2026 at the Port of Xingang aboard OOCL PORTUGAL 008W and is expected at the Port of Rotterdam on Nov 27, 2026. That is about 48 days from loading to arrival.
The shipment moves 1 container, TXGU5761438 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 4,470.000 KGS. The most recent container event is "Loaded (FCL) on OOCL PORTUGAL 008W at TIANJIN (CN)" on Oct 10, 2026.
Cargo loads at the Port of Xingang and is discharged at the Port of Rotterdam before final delivery to Rotterdam, Netherlands.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingXINGANGOct 10, 2026OOCL PORTUGAL 008W
- [NL]DeliveryROTTERDAMNov 27, 2026
Voyage timeline
- XINGANG[CN]Oct 10, 2026
OOCL PORTUGAL 008W
Departed - ROTTERDAM[NL]Nov 27, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 4,470.000 KGS
- Manifest qty
- 290 CARTONS
- Measurement
- 66.1000 CBM
- Vessel / voyage
- OOCL PORTUGAL 008W
- BL no.
- EGLV•••••••••••••
- On-board date
- Oct 10, 2026
Containers 1
Loaded (FCL) on OOCL PORTUGAL 008W at TIANJIN (CN)
Oct 10, 2026