Evergreen
EITU0549247 · Xingang → Rotterdam
EGLV•••••••••••••
- Scheduled transit
- 59 days
- On board → ETA at Rotterdam
- To go
- 6 days
- Until the ETA at Rotterdam, by schedule
Source: bexy, https://bexy.io/track/6af12bc282a8705b120e709c
Shipment summary
This Evergreen shipment from Xingang, China to Rotterdam, Netherlands was loaded on board on Sep 30, 2026 at the Port of Xingang aboard EVER ECHO 0832-003W (長鳴輪) and is expected at the Port of Rotterdam on Nov 28, 2026. That is about 59 days from loading to arrival.
The shipment moves 1 container, EITU0549247 (1 × 20'(SD)), booked PORT/PORT, with a declared gross weight of 23,232.000 KGS. The most recent container event is "Loaded (FCL) on EVER ECHO 0832-003W at TIANJIN (CN)" on Sep 30, 2026.
Cargo loads at the Port of Xingang and is discharged at the Port of Rotterdam before final delivery to Rotterdam, Netherlands.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingXINGANGSep 30, 2026EVER ECHO 0832-003W (長鳴輪)
- [NL]DeliveryROTTERDAMNov 28, 2026
Voyage timeline
- XINGANG[CN]Sep 30, 2026
EVER ECHO 0832-003W (長鳴輪)
Departed - ROTTERDAM[NL]Nov 28, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 23,232.000 KGS
- Manifest qty
- 880 CARTONS
- Measurement
- 25.0000 CBM
- Vessel / voyage
- EVER ECHO 0832-003W (長鳴輪)
- BL no.
- EGLV•••••••••••••
- On-board date
- Sep 30, 2026
Containers 1
Loaded (FCL) on EVER ECHO 0832-003W at TIANJIN (CN)
Sep 30, 2026