Evergreen
EITU9072279 + 1 more · Dalian → Rotterdam
EGLV•••••••••••••
- Scheduled transit
- 42 days
- On board → ETA at Rotterdam
- To go
- 30 days
- Until the ETA at Rotterdam, by schedule
Source: bexy, https://bexy.io/track/6b007183d86851968c0d84ab
Shipment summary
This Evergreen shipment from Dalian, China to Rotterdam, Netherlands was loaded on board on Nov 10, 2026 at the Port of Dalian aboard COSCO SHIPPING VIRGO 037W and is expected at the Port of Rotterdam on Dec 22, 2026. That is about 42 days from loading to arrival.
The shipment moves 2 containers, EITU9072279 and TLLU8021747 (2 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 24,936.760 KGS. The most recent container event is "Loaded (FCL) on COSCO SHIPPING VIRGO 037W at DALIAN, CHINA (CN)" on Nov 10, 2026.
Cargo loads at the Port of Dalian and is discharged at the Port of Rotterdam before final delivery to Rotterdam, Netherlands.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingDALIANNov 10, 2026COSCO SHIPPING VIRGO 037W
- [NL]DeliveryROTTERDAMDec 22, 2026COSCO SHIPPING VIRGO 037W
Voyage timeline
- DALIAN[CN]Nov 10, 2026
COSCO SHIPPING VIRGO 037W
Departed - ROTTERDAM[NL]Dec 22, 2026
COSCO SHIPPING VIRGO 037W
Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 2
- Gross weight
- 24,936.760 KGS
- Manifest qty
- 77 PACKAGES
- Measurement
- 121.3300 CBM
- Vessel / voyage
- COSCO SHIPPING VIRGO 037W
- BL no.
- EGLV•••••••••••••
- On-board date
- Nov 10, 2026
Containers 2
2 × 40'(SH)
Loaded (FCL) on COSCO SHIPPING VIRGO 037W at DALIAN, CHINA (CN)
Nov 10, 2026
Loaded (FCL) on COSCO SHIPPING VIRGO 037W at DALIAN, CHINA (CN)
Nov 10, 2026