Port-to-port route

Shipping from Qingdao to Itapoa

Port of Qingdao, China → Port of Itapoa, Brazil

Ocean freight from the Port of Qingdao to the Port of Itapoa is a tracked port-to-port route on bexy, with 163 shipments on record loaded at Qingdao and discharged at Itapoa. Planned port-to-port transit from Qingdao to Itapoa has a median of 43 days (middle half 43–45 days, 90% within 50 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Itapoa in the carrier's routing, across 22 shipments.

Shipments tracked
163
Median planned port-to-port
43 days
Median actual transit
—
Planned via a hub
0%

Planned port-to-port transit · Qingdao → Itapoa

43days median

Middle half
43–45 days
90% within
50 days
Shipments
22

From the loaded-on-board date at Qingdao to the first planned arrival at Itapoa in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Qingdao to Itapoa ocean freight

In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 22 Qingdao-to-Itapoa shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to Brazil trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Itapoa by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: All 22 shipments with a planned routing to Itapoa are planned direct from Qingdao. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Itapoa

Frequently asked questions

How long does it take to ship from Qingdao to Itapoa?
Planned port-to-port transit from Qingdao to Itapoa has a median of 43 days (middle half 43–45 days, 90% within 50 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Itapoa in the carrier's routing, across 22 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Itapoa adds time.
Is cargo from Qingdao to Itapoa shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, none of the 22 Qingdao-to-Itapoa shipments with a planned routing to the port of discharge called at a transshipment port: all were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Itapoa route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Itapoa travels mostly on the China to Brazil trade lane on bexy.
How many shipments are tracked from Qingdao to Itapoa?
bexy has 163 shipments on record loaded at Qingdao and discharged at Itapoa, the most recent departing Oct 2, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Itapoa?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Itapoa

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 163 tracked Bills of Lading loaded at Qingdao and discharged at Itapoa · planned port-to-port transit over 22 shipments · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Itapoa Shipping Time — Port to Port", data as of 2026-10-19, n = 163 tracked shipments. https://bexy.io/routes/qingdao-to-itapoa

Definitions, thresholds and limitations are on the methodology page.