Port-to-port route

Shipping from Qingdao to Rio Haina

Port of Qingdao, China → Port of Rio Haina, Dominican Republic

Ocean freight from the Port of Qingdao to the Port of Rio Haina is an actively tracked port-to-port route on bexy, with 314 shipments on record loaded at Qingdao and discharged at Rio Haina. Planned port-to-port transit from Qingdao to Rio Haina has a median of 42 days (middle half 38–50 days, 90% within 56 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Rio Haina in the carrier's routing, across 32 shipments.

Shipments tracked
314
Median planned port-to-port
42 days
Median actual transit
—
Planned via a hub
59%

Planned port-to-port transit · Qingdao → Rio Haina

42days median

Middle half
38–50 days
90% within
56 days
Shipments
32

From the loaded-on-board date at Qingdao to the first planned arrival at Rio Haina in the carrier's routing — the carrier's planned dates, port to port, with no inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Qingdao to Rio Haina ocean freight

In the carrier's planned routing at the time bexy read each Bill of Lading, 59% of the 32 Qingdao-to-Rio Haina shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Colon Container Terminal; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.

By place of receipt and delivery, this cargo travels mostly on the China to Dominican Republic trade lane.

Track an Evergreen (EGLV) shipment from Qingdao to Rio Haina by its Bill of Lading or container number on bexy for the vessel, voyage, port milestones and container status — free, with no account needed.

Trade lanes on this route

By place of receipt and delivery; the count is this route's shipments on each lane.

Planned routing: 59% of 32 shipments with a planned routing to Rio Haina are planned via a transshipment port, most often Colon Container Terminal (19); the rest are planned direct. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · Qingdao → Rio Haina

Frequently asked questions

How long does it take to ship from Qingdao to Rio Haina?
Planned port-to-port transit from Qingdao to Rio Haina has a median of 42 days (middle half 38–50 days, 90% within 56 days), an estimate measured from the loaded-on-board date at Qingdao to the first planned arrival at Rio Haina in the carrier's routing, across 32 shipments. These are the carrier's planned dates, port to port; any inland leg after discharge at Rio Haina adds time.
Is cargo from Qingdao to Rio Haina shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 59% of the 32 Qingdao-to-Rio Haina shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Colon Container Terminal; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
Which trade lanes use the Qingdao to Rio Haina route?
By place of receipt and delivery, cargo loaded at Qingdao and discharged at Rio Haina travels mostly on the China to Dominican Republic trade lane on bexy.
How many shipments are tracked from Qingdao to Rio Haina?
bexy has 314 shipments on record loaded at Qingdao and discharged at Rio Haina, the most recent departing Oct 16, 2026. These are the Evergreen (EGLV) shipments on record, not the ports' total throughput.
How do I track a shipment from Qingdao to Rio Haina?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse shipments from Qingdao to Rio Haina

by place of receipt and delivery · filterable by date & weight

View shipments

Aggregated from 314 tracked Bills of Lading loaded at Qingdao and discharged at Rio Haina · planned port-to-port transit over 32 shipments · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "Qingdao to Rio Haina Shipping Time — Port to Port", data as of 2026-10-19, n = 314 tracked shipments. https://bexy.io/routes/qingdao-to-rio-haina

Definitions, thresholds and limitations are on the methodology page.