Trade lane

Shipping from China to Croatia

Ocean freight from China to Croatia is a tracked container trade lane on bexy, with 652 shipments on record. Median estimated transit is 49 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 43 and 57 days and 90% at 63 days or less, across 37 shipments with a usable on-board date and estimated arrival.

Shipments tracked
652
Median est. transit
49 days
Loading ports
5
Discharge ports
1

Estimated transit · China → Croatia

49days median

Middle half
43–57 days
90% within
63 days
Shipments
37

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

China to Croatia ocean freight

Cargo on this lane loads mainly at China ports including Shanghai, Xiamen, Qingdao and Xingang and is discharged mainly at Rijeka on the Croatia side.

Every China-to-Croatia shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.

Destination ports · Croatia

Top port pairs · China → Croatia
Port of loading Port of discharge Shipments Share Planned port-to-port
ShanghaiRijeka41464%—
XiamenRijeka9815%—
QingdaoRijeka8213%—
XingangRijeka498%—
NingboRijeka91%—

Share is of this lane's shipments that record both ports.

Planned routing: 4% of 26 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Ningbo (1); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · China → Croatia

Frequently asked questions

How long does it take to ship from China to Croatia?
The median estimated transit from China to Croatia is 49 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 43 and 57 days and 90% at 63 days or less, across 37 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
Which ports handle China to Croatia shipments?
Cargo most often loads at Shanghai, Xiamen, Qingdao and Xingang. On arrival it is most often discharged at Rijeka.
Is cargo from China to Croatia shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 4% of the 26 China-to-Croatia shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Ningbo; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
How many shipments are tracked on the China to Croatia route?
bexy has 652 shipments on record for the China to Croatia lane, the most recent departing Oct 7, 2026.
How do I track a China to Croatia shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 652 shipments

China → Croatia · filterable by port, date & weight

View shipments

Aggregated from 652 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 37 shipments · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "China to Croatia Shipping — Transit Time", data as of 2026-10-19, n = 652 tracked shipments. https://bexy.io/shipping/china-to-croatia

Definitions, thresholds and limitations are on the methodology page.