Trade lane

Shipping from China to Italy

Ocean freight from China to Italy is an actively tracked container trade lane on bexy, with 8,685 shipments on record. Median estimated transit is 55 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 50 and 64 days and 90% at 73 days or less, across 916 shipments with a usable on-board date and estimated arrival.

Shipments tracked
8,685
Median est. transit
55 days
Loading ports
10
Discharge ports
9

Estimated transit · China → Italy

55days median

Middle half
50–64 days
90% within
73 days
Shipments
916

Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.

Actual transit (from carrier discharge events)

58days median

Middle half 55–63 days · 90% within 72 days · n = 163 shipments with a recorded discharge

Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.

Schedule slip vs plan

0days median · on the planned day

Middle half −1 to +2 days · n = 26 shipments with both a planned arrival and a recorded discharge on this lane, across 10 sailings

Per shipment, the day a container was discharged at the port of discharge minus the carrier's first planned arrival there — whole days, exact to within a day either way; negative means ahead of plan. Each shipment is measured against its own plan, so it is a plain count, not weighted by volume. A sailing is one vessel voyage: every container on a late vessel is late together, so the slip is shown only when its shipments came on at least 5 sailings.

China to Italy ocean freight

Measured from the carrier's container events instead of its estimates, the actual transit from China to Italy — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 58 days (middle half 55–63 days, 90% within 72 days) across 163 shipments with a recorded discharge at the port of discharge.

Cargo on this lane loads mainly at China ports including Shanghai, Qingdao, Xingang and Xiamen and is discharged mainly at Genoa, La Spezia, Trieste and Ancona on the Italy side.

Every China-to-Italy shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until a status reports the shipment at its final destination, for up to 30 days — free, and without an account.

Busiest origin ports · China

Busiest destination ports · Italy

Top port pairs · China → Italy
Port of loading Port of discharge Shipments Share Planned port-to-port Route page
ShanghaiGenoa2,28426%48 days median (46–53) · n = 98Shanghai → Genoa
QingdaoGenoa1,35616%53 days median (51–58) · n = 94Qingdao → Genoa
ShanghaiLa Spezia91010%50 days median (47–54) · n = 50Shanghai → La Spezia
ShanghaiTrieste90010%—Shanghai → Trieste
ShanghaiAncona5386%62 days median (56–67) · n = 23Shanghai → Ancona
XingangGenoa3804%——
QingdaoLa Spezia3454%53 days median (51–59) · n = 28Qingdao → La Spezia
ShanghaiBari2313%——

Share is of this lane's shipments that record both ports. Planned port-to-port is the median (and middle half) from the loaded-on-board date to the first planned arrival at the port of discharge in the carrier's routing — no inland leg, unlike the transit time above — shown when at least 20 shipments have both dates; n is how many of the pair's shipments it rests on.

Planned routing: 22% of 454 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Piraeus (94), Ningbo (4), Singapore (2); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.

Recent shipments · China → Italy

Frequently asked questions

How long does it take to ship from China to Italy?
The median estimated transit from China to Italy is 55 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 50 and 64 days and 90% at 73 days or less, across 916 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
How long does shipping from China to Italy actually take?
The median actual transit from China to Italy is 58 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 55 and 63 days and 90% took 72 days or less, across 163 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
Which ports handle China to Italy shipments?
Cargo most often loads at Shanghai, Qingdao, Xingang and Xiamen. On arrival it is most often discharged at Genoa, La Spezia, Trieste and Ancona.
Is cargo from China to Italy shipped direct or transshipped?
In the carrier's planned routing at the time bexy read each Bill of Lading, 22% of the 454 China-to-Italy shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Piraeus, Ningbo and Singapore; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
How many shipments are tracked on the China to Italy route?
bexy has 8,685 shipments on record for the China to Italy lane, the most recent departing Oct 16, 2026.
How do I track a China to Italy shipment?
Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.

Browse all 8,685 shipments

China → Italy · filterable by port, date & weight

View shipments

Aggregated from 8,685 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 916 shipments · actual transit to discharge over 163 shipments with a recorded discharge · schedule slip vs plan over 26 shipments with both dates, across 10 sailings · data refreshed Oct 19, 2026 · how these figures are built.

Cite this page

bexy, "China to Italy Shipping — Transit Time", data as of 2026-10-19, n = 8,685 tracked shipments. https://bexy.io/shipping/china-to-italy

Definitions, thresholds and limitations are on the methodology page.