Evergreen
EGSU8236133 · Shanghai → Santos
EGLV•••••••••••••
- Scheduled transit
- 29 days
- On board → ETA at Santos
- To go
- 18 days
- Until the ETA at Santos, by schedule
Source: bexy, https://bexy.io/track/6ac6a5404474940c3101dcea
Shipment summary
This Evergreen shipment from Shanghai, China to Santos, Brazil was scheduled to load on board on Oct 8, 2026 at the Port of Shanghai aboard KOTA ELOK 002W, with arrival at the Port of Santos expected on Nov 6, 2026, per carrier data as of Oct 7, 2026. That is about 29 days from loading to arrival.
The shipment moves 1 container, EGSU8236133 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 25,129.900 KGS. The most recent container event is "Loaded (FCL) on KOTA ELOK 002W at SHANGHAI (CN)" on Oct 7, 2026.
Cargo loads at the Port of Shanghai and is discharged at the Port of Santos before final delivery to Santos, Brazil.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingSHANGHAIOct 8, 2026KOTA ELOK 002W
- [BR]DeliverySANTOSNov 6, 2026
Voyage timeline
- SHANGHAI[CN]Oct 8, 2026
KOTA ELOK 002W
Departed (by schedule) - SANTOS[BR]Nov 6, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 25,129.900 KGS
- Manifest qty
- 376 PACKAGES
- Measurement
- 53.1700 CBM
- Vessel / voyage
- KOTA ELOK 002W
- BL no.
- EGLV•••••••••••••
- On-board date
- Oct 8, 2026
Containers 1
Loaded (FCL) on KOTA ELOK 002W at SHANGHAI (CN)
Oct 7, 2026