Evergreen
EGHU9611214 · Shanghai → Rotterdam
EGLV•••••••••••••
- Scheduled transit
- 41 days
- On board → ETA at Rotterdam
- To go
- 14 days
- Until the ETA at Rotterdam, by schedule
Source: bexy, https://bexy.io/track/6aceac0242d2403562060533
Shipment summary
This Evergreen shipment from Shanghai, China to Rotterdam, Netherlands was loaded on board on Sep 22, 2026 at the Port of Shanghai aboard COSCO SHIPPING LEO 037W and is expected at the Port of Rotterdam on Nov 2, 2026. That is about 41 days from loading to arrival.
The shipment moves 1 container, EGHU9611214 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 4,918.070 KGS. The most recent container event is "Loaded (FCL) on COSCO SHIPPING LEO 037W at SHANGHAI (CN)" on Sep 22, 2026.
Cargo loads at the Port of Shanghai and is discharged at the Port of Rotterdam before final delivery to Rotterdam, Netherlands.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingSHANGHAISep 22, 2026COSCO SHIPPING LEO 037W
- [NL]DeliveryROTTERDAMNov 2, 2026
Voyage timeline
- SHANGHAI[CN]Sep 22, 2026
COSCO SHIPPING LEO 037W
Departed - ROTTERDAM[NL]Nov 2, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 4,918.070 KGS
- Manifest qty
- 563 CARTONS
- Measurement
- 35.7640 CBM
- Vessel / voyage
- COSCO SHIPPING LEO 037W
- BL no.
- EGLV•••••••••••••
- On-board date
- Sep 22, 2026
Containers 1
Loaded (FCL) on COSCO SHIPPING LEO 037W at SHANGHAI (CN)
Sep 22, 2026