Evergreen
EMCU5943787 · Qingdao → Rotterdam
EGLV•••••••••••••
- Scheduled transit
- 45 days
- On board → ETA at Rotterdam
- To go
- 14 days
- Until the ETA at Rotterdam, by schedule
Source: bexy, https://bexy.io/track/6acf8f96d172f52f9709367e
Shipment summary
This Evergreen shipment from Qingdao, China to Rotterdam, Netherlands was loaded on board on Sep 18, 2026 at the Port of Qingdao aboard COSCO SHIPPING LEO 037W and is expected at the Port of Rotterdam on Nov 2, 2026. That is about 45 days from loading to arrival.
The shipment moves 1 container, EMCU5943787 (1 × 40'(RH)), booked PORT/PORT, with a declared gross weight of 19,634.000 KGS. The most recent container event is "Loaded (FCL) on COSCO SHIPPING LEO 037W at QINGDAO, CHINA (CN)" on Sep 18, 2026.
Cargo loads at the Port of Qingdao and is discharged at the Port of Rotterdam before final delivery to Rotterdam, Netherlands.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingQINGDAOSep 18, 2026COSCO SHIPPING LEO 037W
- [NL]DeliveryROTTERDAMNov 2, 2026
Voyage timeline
- QINGDAO[CN]Sep 18, 2026
COSCO SHIPPING LEO 037W
Departed - ROTTERDAM[NL]Nov 2, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 19,634.000 KGS
- Manifest qty
- 3,240 CARTONS
- Measurement
- 50.0000 CBM
- Vessel / voyage
- COSCO SHIPPING LEO 037W
- BL no.
- EGLV•••••••••••••
- On-board date
- Sep 18, 2026
Containers 1
Loaded (FCL) on COSCO SHIPPING LEO 037W at QINGDAO, CHINA (CN)
Sep 18, 2026