Evergreen
EGHU9655043 · Shanghai → Antwerp
EGLV•••••••••••••
- Scheduled transit
- 50 days
- On board → ETA at Antwerp
Source: bexy, https://bexy.io/track/6ad1a121d1cb6583cb08053a
Shipment summary
This Evergreen shipment from Shanghai, China to Antwerp, Belgium was loaded on board on Aug 30, 2026 at the Port of Shanghai aboard COSCO SHIPPING SOLAR 037W and was due to arrive at the Port of Antwerp on Oct 19, 2026, per carrier data as of Oct 16, 2026. That is about 50 days from loading to arrival.
The shipment moves 1 container, EGHU9655043 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 18,396.910 KGS. The most recent container event is "Loaded (FCL) on COSCO SHIPPING SOLAR 037W at SHANGHAI (CN)" on Aug 29, 2026.
Cargo loads at the Port of Shanghai and is discharged at the Port of Antwerp before final delivery to Antwerp, Belgium.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingSHANGHAIAug 30, 2026COSCO SHIPPING SOLAR 037W
- [BE]DeliveryANTWERPOct 19, 2026
Voyage timeline
- SHANGHAI[CN]Aug 30, 2026
COSCO SHIPPING SOLAR 037W
Port of loading - ANTWERP[BE]Oct 19, 2026Expected position (by schedule)
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 18,396.910 KGS
- Manifest qty
- 1,428 CARTONS
- Measurement
- 68.4150 CBM
- Vessel / voyage
- COSCO SHIPPING SOLAR 037W
- BL no.
- EGLV•••••••••••••
- On-board date
- Aug 30, 2026
Containers 1
Loaded (FCL) on COSCO SHIPPING SOLAR 037W at SHANGHAI (CN)
Aug 29, 2026