Evergreen
TGBU6967863 · Shanghai → Koper
EGLV•••••••••••••
- Scheduled transit
- 42 days
- On board → ETA at Koper
- To go
- 11 days
- Until the ETA at Koper, by schedule
Source: bexy, https://bexy.io/track/6ad50b270a67f3c73804026d
Shipment summary
This Evergreen shipment from Shanghai, China to Koper, Slovenia was loaded on board on Sep 18, 2026 at the Port of Shanghai aboard CMA CGM PLATINUM 0BEOPW1MA and is expected at the Port of Koper on Oct 30, 2026. That is about 42 days from loading to arrival.
The shipment moves 1 container, TGBU6967863 (1 × 40'(SH)), booked PORT/PORT, with a declared gross weight of 6,427.800 KGS. The most recent container event is "Loaded (FCL) on CMA CGM PLATINUM 0BEOPW1MA at SHANGHAI (CN)" on Sep 18, 2026.
Cargo loads at the Port of Shanghai and is discharged at the Port of Koper before final delivery to Koper, Slovenia.
Vessel, port and container statuses on this page are read from the carrier's own tracking record; shipments past their estimated arrival (the carrier's ETA, or its last planned arrival when it gives none) are re-checked by bexy in hourly batches until the carrier reports them at their final destination, or until 30 days after the estimated arrival if it never does.
Carrier data as of .
Voyage route
- [CN]Port of loadingSHANGHAISep 18, 2026CMA CGM PLATINUM 0BEOPW1MA
- [SI]DeliveryKOPEROct 30, 2026
Voyage timeline
- SHANGHAI[CN]Sep 18, 2026
CMA CGM PLATINUM 0BEOPW1MA
Departed - KOPER[SI]Oct 30, 2026Delivery
Shipment facts
- Service mode
- PORT/PORT
- Containers
- 1
- Gross weight
- 6,427.800 KGS
- Manifest qty
- 228 DRUMS
- Measurement
- 24.8100 CBM
- Vessel / voyage
- CMA CGM PLATINUM 0BEOPW1MA
- BL no.
- EGLV•••••••••••••
- On-board date
- Sep 18, 2026
Containers 1
Loaded (FCL) on CMA CGM PLATINUM 0BEOPW1MA at SHANGHAI (CN)
Sep 18, 2026