Trade lane
Shipping from China to Greece
Ocean freight from China to Greece is an actively tracked container trade lane on bexy, with 3,964 shipments on record. Median estimated transit is 51 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 45 and 59 days and 90% at 69 days or less, across 357 shipments with a usable on-board date and estimated arrival.
- Shipments tracked
- 3,964
- Median est. transit
- 51 days
- Loading ports
- 7
- Discharge ports
- 2
Estimated transit · China → Greece
51days median
- Middle half
- 45–59 days
- 90% within
- 69 days
- Shipments
- 357
Estimated from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, which can include an inland leg; spans over 120 days are left out. The middle half runs from the 25th to the 75th percentile.
Actual transit (from carrier discharge events)
50days median
Middle half 47–59 days · 90% within 71 days · n = 106 shipments with a recorded discharge
Loaded on board → container discharged at the port of discharge, from the carrier's container events: actual dates, not estimates. It has no inland leg, so it is not directly comparable with the estimate, and it rests on fewer shipments because most Bills of Lading are read after the container has been returned empty.
China to Greece ocean freight
Measured from the carrier's container events instead of its estimates, the actual transit from China to Greece — loaded on board to a container discharged at the port of discharge, with no inland leg — has a median of 50 days (middle half 47–59 days, 90% within 71 days) across 106 shipments with a recorded discharge at the port of discharge.
Cargo on this lane loads mainly at China ports including Shanghai, Qingdao, Xiamen and Xingang and is discharged mainly at Piraeus and Thessaloniki on the Greece side.
Every China-to-Greece shipment here travels on an Evergreen (EGLV) Bill of Lading and is read from the carrier's own tracking record: vessel, voyage, port milestones and per-container status, re-checked after the estimated arrival (the ETA, or the last planned arrival when there is none) until arrival, for up to 30 days — free, and without an account.
Destination ports · Greece
| Port of loading | Port of discharge | Shipments | Share | Planned port-to-port |
|---|---|---|---|---|
| Shanghai | Piraeus | 1,369 | 35% | 42 days median (41–50) · n = 34 |
| Qingdao | Piraeus | 668 | 17% | 45 days median (44–47) · n = 64 |
| Shanghai | Thessaloniki | 606 | 15% | 56 days median (52–62) · n = 41 |
| Xiamen | Piraeus | 358 | 9% | — |
| Qingdao | Thessaloniki | 311 | 8% | 59 days median (51–63) · n = 46 |
| Xingang | Piraeus | 256 | 6% | — |
| Ningbo | Piraeus | 160 | 4% | — |
| Xingang | Thessaloniki | 105 | 3% | — |
Share is of this lane's shipments that record both ports. Planned port-to-port is the median (and middle half) from the loaded-on-board date to the first planned arrival at the port of discharge in the carrier's routing — no inland leg, unlike the transit time above — shown when at least 20 shipments have both dates; n is how many of the pair's shipments it rests on.
Planned routing: 32% of 215 shipments with a planned routing to the port of discharge are planned via a transshipment port, most often Piraeus (67), Hong Kong (1); the rest are planned direct from the port of loading to the port of discharge. This is the carrier's planned routing when bexy read each Bill of Lading, and it can change after booking.
Recent shipments · China → Greece
- EITU1751530 · Qingdao → Thessaloniki
- EGSU6009146 · Qingdao → Thessaloniki
- EGHU8255187 · Qingdao → Thessaloniki3×
- TXGU6694102 · Qingdao → Thessaloniki
- EGSU1378080 · Qingdao → Piraeus
- GAOU6437508 · Qingdao → Piraeus
- EGSU6534268 · Qingdao → Piraeus
- EMCU6255747 · Shanghai → Piraeus
- EGSU6391423 · Shanghai → Thessaloniki
- BSIU9960859 · Shanghai → Piraeus
- TLLU5931677 · Qingdao → Piraeus
- EGHU9368629 · Qingdao → Thessaloniki
Frequently asked questions
- How long does it take to ship from China to Greece?
- The median estimated transit from China to Greece is 51 days, measured from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none; half of shipments were estimated at between 45 and 59 days and 90% at 69 days or less, across 357 shipments with a usable on-board date and estimated arrival. The exact time depends on the service, any transshipment and any inland leg to the final destination.
- How long does shipping from China to Greece actually take?
- The median actual transit from China to Greece is 50 days, measured from the loaded-on-board date to the day a container was discharged at the port of discharge, as reported in the carrier's container events; half of these shipments took between 47 and 59 days and 90% took 71 days or less, across 106 shipments with a recorded discharge at the port of discharge. Unlike the estimated transit it ends at the port of discharge, with no inland leg, and it rests on fewer shipments: for most Bills of Lading bexy first reads the record after the container has been returned empty, when the discharge is no longer shown.
- Which ports handle China to Greece shipments?
- Cargo most often loads at Shanghai, Qingdao, Xiamen and Xingang. On arrival it is most often discharged at Piraeus and Thessaloniki.
- Is cargo from China to Greece shipped direct or transshipped?
- In the carrier's planned routing at the time bexy read each Bill of Lading, 32% of the 215 China-to-Greece shipments with a planned routing to the port of discharge were planned via at least one transshipment port, most often Piraeus and Hong Kong; the rest were planned direct from the port of loading to the port of discharge. A transshipment port here is a planned stop between those two ports that is not the place of receipt or delivery, and routings can change after booking.
- How many shipments are tracked on the China to Greece route?
- bexy has 3,964 shipments on record for the China to Greece lane, the most recent departing Oct 5, 2026.
- How do I track a China to Greece shipment?
- Enter the Evergreen (EGLV) Bill of Lading or container number on bexy to see the vessel and voyage, port milestones and estimated arrival — free, with no login required.
Browse all 3,964 shipments
China → Greece · filterable by port, date & weight
Aggregated from 3,964 tracked Bills of Lading · median estimated transit from the loaded-on-board date to the carrier's ETA at the final place of delivery, or the last planned arrival when the carrier gives none, over 357 shipments · actual transit to discharge over 106 shipments with a recorded discharge · data refreshed Oct 6, 2026 · how these figures are built.
Cite this page
bexy, "China to Greece Shipping — Transit Time", data as of 2026-10-06, n = 3,964 tracked shipments. https://bexy.io/shipping/china-to-greeceDefinitions, thresholds and limitations are on the methodology page.